202
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Miscellaneous structural metal work | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
LE0556 #09 Y:2023 | 09 | 2023 | Install compressor air intakes in coolest locations | $902 | $4,000 | |
LE0556 #08 Y:2023 | 08 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $8,743 | $27,818 | |
LE0556 #07 Y:2023 | 07 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $8,639 | $23,495 | |
LE0556 #06 Y:2023 | 06 | 2023 | Utilize higher efficiency lamps and/or ballasts | $27,435 | $62,448 | |
LE0556 #05 Y:2023 | 05 | 2023 | Re-use or recycle hot or cold process exhaust air | $11,775 | $16,000 | |
LE0556 #04 Y:2023 | 04 | 2023 | Use / purchase optimum sized compressor | $94,269 | $90,000 | |
LE0556 #03 Y:2023 | 03 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,711 | $2,200 | |
LE0556 #02 Y:2023 | 02 | 2023 | Install timers and/or thermostats | $858 | $1,520 | |
LE0556 #01 Y:2023 | 01 | 2023 | Reduce the pressure of compressed air to the minimum required | $5,762 | $100 | |
CI0001 #07 Y:2022 | 07 | 2022 | Use photocell controls | $1,147 | $1,440 | |
CI0001 #06 Y:2022 | 06 | 2022 | Reduce the pressure of compressed air to the minimum required | $1,304 | $25 | |
CI0001 #05 Y:2022 | 05 | 2022 | Use / purchase optimum sized compressor | $2,000 | $5,000 | |
CI0001 #04 Y:2022 | 04 | 2022 | Recharge batteries on during off-peak demand periods | $2,151 | $100 | |
CI0001 #03 Y:2022 | 03 | 2022 | Re-size charging openings or add a movable door on equipment | $5,122 | $6,000 | |
CI0001 #02 Y:2022 | 02 | 2022 | Recover waste heat from equipment | $16,299 | $3,500 | |
CI0001 #01 Y:2022 | 01 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $27,056 | $750 | |
NL0052 #06 Y:2020 | 06 | 2020 | Install compressor air intakes in coolest locations | $465 | $2,000 | |
NL0052 #05 Y:2020 | 05 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,620 | $2,000 | |
NL0052 #04 Y:2020 | 04 | 2020 | Utilize higher efficiency lamps and/or ballasts | $2,375 | $2,354 | |
NL0052 #03 Y:2020 | 03 | 2020 | Meter waste water | $4,017 | $580 |