ITAC Assessment: CI0001
ITAC logo
ITAC Assessment: CI0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Metal retainer with rubber seals
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $10
M
to 50
M
# of Employees 158
Plant Area 66,336
ft2
Annual Production 186,553
pieces
Production Hrs. Annual 5,616
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,941 2,366,759
kWh
Electricity Demand $244,010 10,887
kW-mo/yr
Electricity Fees $179,031 -
Natural Gas $8,233 287
MMBtu
Waste Disposal Costs
Water Usage $16,625 987,360
Tgal
TOTAL YEARLY COSTS $583,840
RECOMMENDED SAVINGS* $55,079 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,056

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $27,056 $750 $13,473
236,360
kWh
$13,583
-
kW-mo/yr
- -
02 2.2437: Recover waste heat from equipment $16,299 $3,500 $4,682
82,148
kWh
$11,617
-
kW-mo/yr
- -
03 2.1122: Re-size charging openings or add a movable door on equipment $5,122 $6,000 $5,122
89,856
kWh
- - -
04 2.3132: Recharge batteries on during off-peak demand periods $2,151 $100 - $2,151
-
kW-mo/yr
- -
05 2.4226: Use / purchase optimum sized compressor $2,000 $5,000 $2,000
35,087
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,304 $25 $461
8,081
kWh
$843
-
kW-mo/yr
- -
07 2.7134: Use photocell controls $1,147 $1,440 $345
6,050
kWh
$622
-
kW-mo/yr
$82 $98
TOTAL RECOMMENDED $55,079 $16,815 $26,083
457,582
kWh
$28,816
-
kW-mo/yr
$82 $98
TOTAL IMPLEMENTED $27,056 $750 $13,473
236,360
kWh
$13,583
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs