ITAC Assessment: MS0432
ITAC logo
ITAC Assessment: MS0432
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Vacuum Trucks
NAICS 332420: Metal Tank (Heavy Gauge) Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 132
Plant Area 150,000
ft2
Annual Production 227
units
Production Hrs. Annual 2,125
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,988 989,094
kWh
Electricity Fees $10,877 -
Waste Disposal Costs
Water Usage $1,434 415
Tgal
TOTAL YEARLY COSTS $129,299
RECOMMENDED SAVINGS* $63,042 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7232: Replace existing hvac unit with high efficiency model $399 $4,320 $399
3,327
kWh
02 2.4226: Use / purchase optimum sized compressor $5,546 $29,394 $5,546
46,218
kWh
03 2.9114: Use solar heat to make electricty $57,097 $340,025 $57,097
475,812
kWh
TOTAL RECOMMENDED $63,042 $373,739 $63,042
525,356
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs