ITAC Assessment: NL0052
ITAC logo
ITAC Assessment: NL0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Custom Metal Parts
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 220,000
ft2
Annual Production 3,500
ton
Production Hrs. Annual 2,500
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,131 3,987,427
kWh
Electricity Demand $194,145 10,907
kW-mo/yr
Electricity Fees $74,801 -
Natural Gas $151,354 27,512
MMBtu
Waste Disposal Costs
Water Usage $13,479 5,535
Tgal
Water Disposal $14,316 5,535
Tgal
TOTAL YEARLY COSTS $554,226
RECOMMENDED SAVINGS* $25,482 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,477

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4224: Upgrade controls on compressors $11,815 $4,420 $1,580
58,700
kWh
$10,235
-
kW-mo/yr
- - - -
02 2.1122: Re-size charging openings or add a movable door on equipment $5,190 $6,320 - - $5,190
-
MMBtu
- - -
03 3.4155: Meter waste water $4,017 $580 - - - $4,017
-
Tgal
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,375 $2,354 $1,146
42,430
kWh
$1,230
-
kW-mo/yr
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,620 $2,000 $2,280
84,409
kWh
- - - $(-560.0) $(-100.0)
06 2.4221: Install compressor air intakes in coolest locations $465 $2,000 $465
17,275
kWh
- - - - -
TOTAL RECOMMENDED $25,482 $17,674 $5,471
202,814
kWh
$11,465
-
kW-mo/yr
$5,190
-
MMBtu
$4,017
-
Tgal
$(-560.0) $(-100.0)
TOTAL IMPLEMENTED $8,477 $6,934 $3,891
144,114
kWh
$1,230
-
kW-mo/yr
- $4,017
-
Tgal
$(-560.0) $(-100.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs