ITAC Assessment: LE0556
ITAC logo
ITAC Assessment: LE0556
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Steel Structures
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $50
M
to 100
M
# of Employees 90
Plant Area 300,000
ft2
Annual Production 200
units
Production Hrs. Annual 4,628
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $480,169 5,143,200
kWh
Electricity Demand $58,851 23,106
kW-mo/yr
Electricity Fees $81,373 -
LPG $157,008 12,994
MMBtu
TOTAL YEARLY COSTS $777,401
RECOMMENDED SAVINGS* $161,094 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $5,762 $100 $5,052
54,331
kWh
$710
-
kW-mo/yr
- -
02 2.7261: Install timers and/or thermostats $858 $1,520 $858
9,222
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,711 $2,200 $2,352
25,566
kWh
$359
-
kW-mo/yr
- -
04 2.4226: Use / purchase optimum sized compressor $94,269 $90,000 - - - $94,269
05 2.2443: Re-use or recycle hot or cold process exhaust air $11,775 $16,000 - - $11,775
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $27,435 $62,448 $25,307
272,118
kWh
$2,128
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,639 $23,495 $8,066
86,734
kWh
$573
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,743 $27,818 $7,666
82,433
kWh
$1,077
-
kW-mo/yr
- -
09 2.4221: Install compressor air intakes in coolest locations $902 $4,000 $791
8,515
kWh
$111
-
kW-mo/yr
- -
TOTAL RECOMMENDED $161,094 $227,581 $50,092
538,919
kWh
$4,958
-
kW-mo/yr
$11,775
-
MMBtu
$94,269
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs