1,219

matching recommendations
$
$
SIC 3443 Fabricated plate work (boiler shops)
ID Description Yearly
Savings
Imp
Cost
MS0432 #03 Y:2024 Use solar heat to make electricty $57,097 $340,025
MS0432 #02 Y:2024 Use / purchase optimum sized compressor $5,546 $29,394
MS0432 #01 Y:2024 Replace existing hvac unit with high efficiency model $399 $4,320
AM0927 #05 Y:2024 Use synthetic lubricant $295 $166
AM0927 #04 Y:2024 Utilize energy-efficient belts and other improved mechanisms $841 $166
AM0927 #03 Y:2024 Optimize plant power factor $5,300 $8,620
AM0927 #02 Y:2024 Redesign process $7,085 $34,585
AM0927 #01 Y:2024 Replace fossil fuel equipment with electrical equipment $86,006 $120,000
TT0300 #11 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,868 $1,965
TT0300 #10 Y:2023 Upgrade controls on compressors $8,509 $17,500
TT0300 #09 Y:2023 Reduce the pressure of compressed air to the minimum required $8,809 $156
TT0300 #08 Y:2023 Utilize higher efficiency lamps and/or ballasts $10,614 $19,910
TT0300 #07 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $12,049 $13,500
TT0300 #06 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $14,078 $18,500
TT0300 #05 Y:2023 Recover waste heat from equipment $18,281 $13,000
TT0300 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $20,075 $30,000
TT0300 #03 Y:2023 Optimize plant power factor $22,385 $37,500
TT0300 #02 Y:2023 Begin a practice of predictive / preventative maintenance $41,095 $32,000
TT0300 #01 Y:2023 Use solar heat to make electricty $46,047 $221,715
SU0520 #07 Y:2022 Eliminate or reduce compressed air usage $173 $831