SIC | Fabricated plate work (boiler shops) | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UL2511 #07 Y:2025 | 07 | 2025 | Use outside cold water source as a supply of cooling water | $65,206 | $43,234 |
n/a
|
UL2511 #06 Y:2025 | 06 | 2025 | Use solar heat to make electricty | $33,929 | $245,037 |
n/a
|
UL2511 #05 Y:2025 | 05 | 2025 | Install occupancy sensors | $3,468 | $1,480 |
n/a
|
UL2511 #04 Y:2025 | 04 | 2025 | Utilize higher efficiency lamps and/or ballasts | $4,104 | $2,409 |
n/a
|
UL2511 #03 Y:2025 | 03 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $7,714 | $9,750 |
n/a
|
UL2511 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,222 | $720 |
n/a
|
UL2511 #01 Y:2025 | 01 | 2025 | Reduce the pressure of compressed air to the minimum required | $4,525 | - |
n/a
|
MU0077 #07 Y:2025 | 07 | 2025 | Install partitions to reduce size of conditioned space | $1,816 | $2,353 |
n/a
|
MU0077 #06 Y:2025 | 06 | 2025 | Reduce space conditioning during non-working hours | $654 | - |
n/a
|
MU0077 #05 Y:2025 | 05 | 2025 | Keep equipment clean | $1,593 | - |
n/a
|
MU0077 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $57 | $80 |
n/a
|
MU0077 #03 Y:2025 | 03 | 2025 | Install vinyl strip / high speed / air curtain doors | $2,396 | $4,121 |
n/a
|
MU0077 #02 Y:2025 | 02 | 2025 | Recover heat from exhausted steam, hot air or hot water | $8,641 | $62,943 |
n/a
|
MU0077 #01 Y:2025 | 01 | 2025 | Recharge batteries on during off-peak demand periods | $13,036 | $2,070 |
n/a
|
OK1146 #10 Y:2025 | 10 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $67,194 | $36,360 |
n/a
|
OK1146 #09 Y:2025 | 09 | 2025 | Use solar heat to make electricty | $12,341 | $218,400 |
n/a
|
OK1146 #08 Y:2025 | 08 | 2025 | Utilize higher efficiency lamps and/or ballasts | $20,326 | $16,391 |
n/a
|
OK1146 #07 Y:2025 | 07 | 2025 | Clean and maintain refrigerant condensers and towers | $878 | $1,980 |
n/a
|
OK1146 #06 Y:2025 | 06 | 2025 | Repair faulty insulation in furnaces, boilers, etc | $7,470 | $1,913 |
n/a
|
OK1146 #05 Y:2025 | 05 | 2025 | Eliminate or reduce compressed air usage | $723 | $621 |