ITAC Assessment: UL2511
ITAC logo
ITAC Assessment: UL2511
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Metal Cylanders
NAICS 332420: Metal Tank (Heavy Gauge) Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area 46,300
ft2
Annual Production 1,800,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $292,826 2,687,840
kWh
Electricity Demand $98,692 6,049
kW-mo/yr
Electricity Fees $39,045 -
Natural Gas $24,151 3,710
MMBtu
Waste Disposal Costs
Water Usage $31,762 2,362
Tgal
TOTAL YEARLY COSTS $486,476
RECOMMENDED SAVINGS* $123,168 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Consumption Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,525 - $4,525
41,547
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,222 $720 $4,222
38,766
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,714 $9,750 $7,714
70,838
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,104 $2,409 $3,218
29,552
kWh
$886
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $3,468 $1,480 $3,468
31,848
kWh
- -
06 2.9114: Use solar heat to make electricty $33,929 $245,037 $26,576
243,943
kWh
$7,353
-
kW-mo/yr
-
07 2.2692: Use outside cold water source as a supply of cooling water $65,206 $43,234 $48,770
447,843
kWh
$11,235
-
kW-mo/yr
$5,201
-
Tgal
TOTAL RECOMMENDED $123,168 $302,630 $98,493
904,337
kWh
$19,474
-
kW-mo/yr
$5,201
-
Tgal
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs