Assessment Year | 2025 |
---|---|
Principal Product | Metal Cylanders |
NAICS | 332420: Metal Tank (Heavy Gauge) Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 82 |
Plant Area |
46,300
ft2
|
Annual Production | 1,800,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $292,826 | 2,687,840 |
kWh
|
$0.11 | |
Electricity Demand | $98,692 | 6,049 |
kW-mo/yr
|
$16.32 | |
Electricity Fees | $39,045 | - |
|
- | |
Natural Gas | $24,151 | 3,710 |
MMBtu
|
$6.51 | |
Waste Disposal Costs | |||||
Water Usage | $31,762 | 2,362 |
Tgal
|
$13.45 | |
TOTAL YEARLY COSTS | $486,476 | ||||
RECOMMENDED SAVINGS* | $123,168 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,525 | - |
$4,525
41,547
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,222 | $720 |
$4,222
38,766
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,714 | $9,750 |
$7,714
70,838
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,104 | $2,409 |
$3,218
29,552
kWh
|
$886
-
kW-mo/yr
|
- | |
05 | 2.7135: Install occupancy sensors | $3,468 | $1,480 |
$3,468
31,848
kWh
|
- | - | |
06 | 2.9114: Use solar heat to make electricty | $33,929 | $245,037 |
$26,576
243,943
kWh
|
$7,353
-
kW-mo/yr
|
- | |
07 | 2.2692: Use outside cold water source as a supply of cooling water | $65,206 | $43,234 |
$48,770
447,843
kWh
|
$11,235
-
kW-mo/yr
|
$5,201
-
Tgal
|
|
TOTAL RECOMMENDED | $123,168 | $302,630 |
$98,493
904,337
kWh
|
$19,474
-
kW-mo/yr
|
$5,201
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs