Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

377

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Hand and edge tools, except machine tools and handsaws
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0127 #08 Y:2026 Close holes and openings in building such as broken windows $71 $65
NL0127 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $151 $250
NL0127 #06 Y:2026 Install timers and/or thermostats $347 $644
NL0127 #05 Y:2026 Utilize energy-efficient belts and other improved mechanisms $1,352 $2,746
NL0127 #04 Y:2026 Eliminate or reduce compressed air usage $1,664 $3,007
NL0127 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $10,157 $29,281
NL0127 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $10,443 $5,000
NL0127 #01 Y:2026 Use closed cycle process to minimize waste water production $14,253 $29,883
IC0264 #06 Y:2022 Reduce ventilation air $1,650 $6,000
IC0264 #05 Y:2022 Optimize plant power factor $3,552 $15,893
IC0264 #04 Y:2022 Upgrade controls on compressors $2,600 $15,017
IC0264 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $2,361 $10,377
IC0264 #02 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $3,944 $4,150
IC0264 #01 Y:2022 Recover waste heat from equipment $5,084 $2,113
WV0616 #10 Y:2021 Develop a repair/replace policy $173 $594
WV0616 #09 Y:2021 Eliminate or reduce compressed air usage $412 $25
WV0616 #08 Y:2021 Convert to oxyfuel burners $980 $4,400
WV0616 #07 Y:2021 Eliminate or reduce compressed air usage $1,963 $542
WV0616 #06 Y:2021 Reschedule plant operations or reduce load to avoid peaks $2,047 $4,500
WV0616 #05 Y:2021 Install occupancy sensors $2,079 $2,877