Assessment Year | 2012 |
---|---|
Principal Product | Hammers, axes, prybars |
NAICS | 332216: Saw Blade and Handtool Manufacturing |
SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
163,031
ft2
|
Annual Production | 1,500,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $109,472 | 3,159,840 |
kWh
|
$0.035 |
Electricity Demand | $110,038 | 11,518 |
kW-mo/yr
|
$9.55 |
Natural Gas | $242,302 | 35,928 |
MMBtu
|
$6.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,184 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,232 | $1,766 |
$1,457
42,118
kWh
|
$775
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,297 | $17,028 |
$9,801
283,200
kWh
|
$5,496
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,620 | $1,000 |
$786
24,194
kWh
|
$834
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,257 | $700 |
$736
21,241
kWh
|
$521
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $689 | $10 |
$403
11,643
kWh
|
$286
-
kW-mo/yr
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $950 | $1,000 |
$170
4,376
kWh
|
$780
-
kW-mo/yr
|
- | - | |
07 | 2.7134: Use photocell controls | $1,653 | $480 |
$713
20,615
kWh
|
$940
-
kW-mo/yr
|
- | - | |
08 | 2.7135: Install occupancy sensors | $1,981 | $975 |
$1,253
36,215
kWh
|
$728
-
kW-mo/yr
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $505 | $475 |
$197
5,659
kWh
|
$74
-
kW-mo/yr
|
$98 | $136 | |
TOTAL RECOMMENDED | $26,184 | $23,434 |
$15,516
449,261
kWh
|
$10,434
-
kW-mo/yr
|
$98 | $136 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs