ITAC Assessment: BS0148
ITAC logo
ITAC Assessment: BS0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Wood Resin
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $50
M
to 100
M
# of Employees 19
Plant Area 2,600
ft2
Annual Production 396,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Montana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $390,975 4,296,433
kWh
Natural Gas $257,353 61,492
MMBtu
TOTAL YEARLY COSTS $648,329
RECOMMENDED SAVINGS* $52,075 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $39,220 $24,000 $39,220
430,922
kWh
-
02 2.2437: Recover waste heat from equipment $11,112 $50,404 - $11,112
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $445 $649 - $445
-
MMBtu
04 2.7135: Install occupancy sensors $1,298 $600 $1,298
14,263
kWh
-
TOTAL RECOMMENDED $52,075 $75,653 $40,518
445,185
kWh
$11,557
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs