ITAC Assessment: BD0322
ITAC logo
ITAC Assessment: BD0322
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Striking Tools
NAICS 332216: Saw Blade and Handtool Manufacturing
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 75,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 6,140
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,346 4,895,760
kWh
Electricity Demand $129,636 14,090
kW-mo/yr
Electricity Fees $7,179 -
Natural Gas $745,608 71,387
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $170,145 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $436 $525 $126
5,242
kWh
$310
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $623 $663 $192
7,989
kWh
$101
-
kW-mo/yr
- $138 $192
03 2.2437: Recover waste heat from equipment $30,494 $1,500 - - $30,494
-
MMBtu
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,933 - $1,104
46,006
kWh
$829
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $1,695 $1,000 $968
40,337
kWh
$727
-
kW-mo/yr
- - -
06 2.4314: Use synthetic lubricant $1,672 $1,692 $955
39,801
kWh
$717
-
kW-mo/yr
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,691 $1,200 $2,682
11,760
kWh
$2,009
-
kW-mo/yr
- - -
08 2.4133: Use most efficient type of electric motors $9,911 $9,911 $3,607
150,274
kWh
$6,304
-
kW-mo/yr
- - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,149 $2,235 $1,146
47,735
kWh
$2,003
-
kW-mo/yr
- - -
10 2.2437: Recover waste heat from equipment $56,660 $60,000 $(-18,544.0)
(-120,628)
kWh
- $75,204
-
MMBtu
- -
11 3.2123: Convert to high volume low pressure (hvlp) paint guns $58,881 $2,200 - - - - $58,881
TOTAL RECOMMENDED $170,145 $80,926 $(-7,764.0)
228,516
kWh
$13,000
-
kW-mo/yr
$105,698
-
MMBtu
$138 $59,073
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs