ITAC Assessment: LE0585
ITAC logo
ITAC Assessment: LE0585
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Chemical mixing
NAICS 424690: Other Chemical and Allied Products Merchant Wholesalers
SIC 5169: Chemicals and Allied Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 238
Plant Area 270,000
ft2
Annual Production 88,504
ton
Production Hrs. Annual 3,822
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,479 1,903,767
kWh
Electricity Demand $20,342 4,042
kW-mo/yr
Electricity Fees $28,181 -
Natural Gas $74,821 13,851
MMBtu
TOTAL YEARLY COSTS $232,823
RECOMMENDED SAVINGS* $190,376 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7261: Install timers and/or thermostats $27,784 - $784
13,529
kWh
- $27,000
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,317 $2,200 $14,842
255,896
kWh
$2,475
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,395 $660 $1,194
20,592
kWh
$201
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $11,641 $25,639 $11,229
193,610
kWh
$412
-
kW-mo/yr
- -
05 2.9112: Use solar heat to heat water $132,239 $658,000 $48,474
598,450
kWh
- - $83,765
TOTAL RECOMMENDED $190,376 $686,499 $76,523
1,082,077
kWh
$3,088
-
kW-mo/yr
$27,000
-
MMBtu
$83,765
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs