Assessment Year | 2009 |
---|---|
Principal Product | Hammers, Axes and Other Striking Tools |
NAICS | 332216: Saw Blade and Handtool Manufacturing |
SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
Sales Range | $1 M to 5M |
# of Employees | 248 |
Plant Area |
119,000
ft2
|
Annual Production | 9,000,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $515,348 | 7,587,333 |
kWh
|
$0.068 |
Electricity Demand | $116,680 | 22,148 |
kW-mo/yr
|
$5.27 |
Electricity Fees | $52,528 | - |
|
- |
Natural Gas | $444,997 | 51,286 |
MMBtu
|
$8.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $70,824 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,717 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,972 | $37,980 |
$13,837
524
kWh
|
$3,135
-
kW-mo/yr
|
- | |
02 | 2.7135: Install occupancy sensors | $9,054 | $10,125 |
$4,709
178
kWh
|
$4,345
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,369 | $1,000 |
$1,939
97
kWh
|
$430
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,486 | - |
$5,558
210
kWh
|
$928
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,914 | $300 |
$4,212
159
kWh
|
$702
-
kW-mo/yr
|
- | |
06 | 2.4314: Use synthetic lubricant | $1,494 | $300 |
$210
8
kWh
|
$1,284
-
kW-mo/yr
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $17,823 | $43,280 |
$14,136
535
kWh
|
$3,687
-
kW-mo/yr
|
- | |
08 | 2.2437: Recover waste heat from equipment | $11,712 | $6,000 | - | - |
$11,712
-
MMBtu
|
|
TOTAL RECOMMENDED | $70,824 | $98,985 |
$44,601
1,711
kWh
|
$14,511
-
kW-mo/yr
|
$11,712
-
MMBtu
|
||
TOTAL IMPLEMENTED | $30,717 | $43,880 |
$24,116
912
kWh
|
$6,601
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs