Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Primary metal products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0392 #08 Y:2009 Utilize higher efficiency lamps and/or ballasts $186 $577
NC0392 #07 Y:2009 Utilize higher efficiency lamps and/or ballasts $5,657 $33,097
NC0392 #06 Y:2009 Develop a repair/replace policy $2,139 $3,888
NC0392 #05 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $315 $100
NC0392 #04 Y:2009 Recover waste heat from equipment $3,938 $4,825
NC0392 #03 Y:2009 Use / purchase optimum sized compressor $5,152 $23,000
NC0392 #02 Y:2009 Use waste heat from hot flue gases to preheat $74,466 $220,000
NC0392 #01 Y:2009 Install equipment to move product $21,004 $50,000
NC0303 #07 Y:2004 Install compressor air intakes in coolest locations $1,085 $1,385
NC0303 #06 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $1,224 $100
NC0303 #05 Y:2004 Redesign process $73,700 $35,000
NC0303 #04 Y:2004 Replace the chlorination stage with an oxygen or ozone stage $11,844 $18,280
NC0303 #03 Y:2004 Use waste heat from hot flue gases to preheat $18,426 $18,825
NC0303 #02 Y:2004 Reschedule plant operations or reduce load to avoid peaks $20,788 -
NC0303 #01 Y:2004 Adopt in-house material generation $34,730 $120,000
NC0002 #06 Y:1993 Insulate glazing, walls, ceilings, and roofs $17,784 $39,880
NC0002 #05 Y:1993 Install skylights $5,957 $9,715
NC0002 #04 Y:1993 Eliminate leaks in inert gas and compressed air lines/ valves $1,206 $100
NC0002 #03 Y:1993 Remove or close off unneeded compressed air lines $1,991 $1,209
NC0002 #02 Y:1993 Install spectral reflectors / delamp $3,351 $120