ITAC Assessment: NC0392
ITAC logo
ITAC Assessment: NC0392
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Powdered aluminum parts
NAICS 331314: Secondary Smelting and Alloying of Aluminum
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 56
Plant Area 66,000
ft2
Annual Production 23,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,235 2,871,340
kWh
Electricity Demand $61,037 7,271
kW-mo/yr
Electricity Fees $2,887 -
Natural Gas $96,809 7,018
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $112,857 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,162

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.445: Install equipment to move product $21,004 $50,000 $661
21,521
kWh
$343
-
kW-mo/yr
- $20,000 -
02 2.2414: Use waste heat from hot flue gases to preheat $74,466 $220,000 - - $74,466
-
MMBtu
- -
03 2.4226: Use / purchase optimum sized compressor $5,152 $23,000 $3,015
98,112
kWh
$2,137
-
kW-mo/yr
- - -
04 2.2437: Recover waste heat from equipment $3,938 $4,825 - - $3,938
-
MMBtu
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $315 $100 $339
11,040
kWh
$176
-
kW-mo/yr
- $(-200.0) -
06 2.4151: Develop a repair/replace policy $2,139 $3,888 $1,409
45,840
kWh
$730
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,657 $33,097 $4,462
145,188
kWh
$2,308
-
kW-mo/yr
- - $(-1,113.0)
08 2.7142: Utilize higher efficiency lamps and/or ballasts $186 $577 $127
4,140
kWh
$66
-
kW-mo/yr
- - $(-7.0)
TOTAL RECOMMENDED $112,857 $335,487 $10,013
325,841
kWh
$5,760
-
kW-mo/yr
$78,404
-
MMBtu
$19,800 $(-1,120.0)
TOTAL IMPLEMENTED $27,162 $83,774 $5,589
181,889
kWh
$2,893
-
kW-mo/yr
- $19,800 $(-1,120.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs