| Assessment Year | 1994 |
|---|---|
| Principal Product | Extruded aluminum products |
| NAICS |
n/a
|
| SIC | 3354: Aluminum Extruded Products |
| Sales Range | $10 M to 50M |
| # of Employees | 225 |
| Plant Area |
160,000
ft2
|
| Annual Production | 6,500,000
lb
|
| Production Hrs. Annual | 6,732
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $779,157 | 11,297,480 |
kWh
|
$0.069 |
| Natural Gas | $198,731 | 61,851 |
MMBtu
|
$3.21 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $67,097 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,917 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $641 | $10,433 |
$641
20,223
kWh
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $298 | $7,270 |
$298
10,551
kWh
|
- | |
| 03 | 2.2511: Insulate bare equipment | $8,461 | $2,598 | - |
$8,461
-
MMBtu
|
|
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $41,062 | $5,000 | - |
$41,062
-
MMBtu
|
|
| 05 | 2.1213: Direct warmest air to combustion intake | $10,474 | $5,800 | - |
$10,474
-
MMBtu
|
|
| 06 | 2.7241: Install outside air damper / economizer on hvac unit | $3,183 | $967 |
$3,183
99,648
kWh
|
- | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $336 | $620 |
$336
11,723
kWh
|
- | |
| 08 | 2.7124: Make a practice of turning off lights when not needed | $1,377 | $365 |
$1,377
48,359
kWh
|
- | |
| 09 | 2.4314: Use synthetic lubricant | $1,265 | - |
$1,265
44,549
kWh
|
- | |
| TOTAL RECOMMENDED | $67,097 | $33,053 |
$7,100
235,053
kWh
|
$59,997
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $3,917 | $18,688 |
$3,917
135,405
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs