76
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Metal heat treating | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1100 #08 Y:2024 | 08 | 2024 | Utilize higher efficiency lamps and/or ballasts | $5,007 | $8,000 | |
| UD1100 #07 Y:2024 | 07 | 2024 | Install occupancy sensors | $5,242 | $7,768 | |
| UD1100 #06 Y:2024 | 06 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $3,587 | - | |
| UD1100 #05 Y:2024 | 05 | 2024 | Optimize plant power factor | $12,387 | $23,400 | |
| UD1100 #04 Y:2024 | 04 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,770 | $1,000 | |
| UD1100 #03 Y:2024 | 03 | 2024 | Reduce space conditioning during non-working hours | $879 | - | |
| UD1100 #02 Y:2024 | 02 | 2024 | Keep doors and windows shut when not on use | $1,520 | - | |
| UD1100 #01 Y:2024 | 01 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $118 | $200 | |
| CW0117 #10 Y:2021 | 10 | 2021 | Recover waste heat from equipment | $879 | $5,742 | |
| CW0117 #09 Y:2021 | 09 | 2021 | Use / purchase optimum sized compressor | $4,222 | $15,730 | |
| CW0117 #08 Y:2021 | 08 | 2021 | Upgrade controls on compressors | $11,576 | $32,850 | |
| CW0117 #07 Y:2021 | 07 | 2021 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,334 | $255 | |
| CW0117 #06 Y:2021 | 06 | 2021 | Use a different or recycled raw material | $217,090 | $846,410 | |
| CW0117 #05 Y:2021 | 05 | 2021 | Recycle white water | $2,598 | $6,039 | |
| CW0117 #04 Y:2021 | 04 | 2021 | Heat water with exhaust heat | $1,331 | $2,149 | |
| CW0117 #03 Y:2021 | 03 | 2021 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $621 | $1,288 | |
| CW0117 #02 Y:2021 | 02 | 2021 | Minimize operation of equipment maintained in standby condition | $20,258 | $28,161 | |
| CW0117 #01 Y:2021 | 01 | 2021 | Utilize higher efficiency lamps and/or ballasts | $4,860 | $6,780 | |
| WV0531 #10 Y:2016 | 10 | 2016 | Develop a repair/replace policy | $256 | $649 | |
| WV0531 #09 Y:2016 | 09 | 2016 | Establish a predictive maintenance program | $956 | $1,000 |