ITAC Assessment: WV0531
ITAC logo
ITAC Assessment: WV0531
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Metal Heat Treating
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area 27,500
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 5,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,251 1,191,000
kWh
Electricity Demand $24,054 3,948
kW-mo/yr
Electricity Fees $240 -
Natural Gas $125,939 41,487
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $16,380 1,800,000
lb
TOTAL YEARLY COSTS $260,864
RECOMMENDED SAVINGS* $74,938 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,105

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.1221: Replace obsolete burners with more efficient ones $19,064 $33,000 - - $19,064
-
MMBtu
- -
02 2.2414: Use waste heat from hot flue gases to preheat $18,039 $63,000 $(-438.0)
(-5,534)
kWh
- $18,477
-
MMBtu
- -
03 2.2511: Insulate bare equipment $12,371 $25,305 $3,013
38,090
kWh
$518
-
kW-mo/yr
$8,840
-
MMBtu
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $11,464 $4,100 - - $12,303
-
MMBtu
- $(-839.0)
05 2.6232: Install set-back timers $4,942 - $4,473
56,549
kWh
$469
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,891 $8,624 $3,325
42,308
kWh
$566
-
kW-mo/yr
- - -
07 3.5222: Use sand for other purposes (eg construction fill, cover for municipal landfills) $2,730 $2,795 - - - $2,730
-
lb
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,225 $4,010 $957
12,096
kWh
$268
-
kW-mo/yr
- - -
09 2.4157: Establish a predictive maintenance program $956 $1,000 $1,954
24,697
kWh
$335
-
kW-mo/yr
- - $(-1,333.0)
10 2.4151: Develop a repair/replace policy $256 $649 $330
4,168
kWh
$55
-
kW-mo/yr
- - $(-129.0)
TOTAL RECOMMENDED $74,938 $142,483 $13,614
172,374
kWh
$2,211
-
kW-mo/yr
$58,684
-
MMBtu
$2,730
-
lb
$(-2,301.0)
TOTAL IMPLEMENTED $35,105 $43,688 $14,052
177,908
kWh
$2,211
-
kW-mo/yr
$21,143
-
MMBtu
- $(-2,301.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs