ITAC Assessment: CW0117
ITAC logo
ITAC Assessment: CW0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Metal Heat Treating Products
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 45,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 6,257
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $231,832 4,558,246
kWh
Electricity Demand $165,928 10,796
kW-mo/yr
Electricity Fees $26,113 -
Natural Gas $198,754 101,740
MMBtu
Waste Disposal Costs
Water Usage $1,445 412
Tgal
Water Disposal $5,271 412
Tgal
Other Liquid (non-haz) $249,842 97,257
gal
TOTAL YEARLY COSTS $879,187
RECOMMENDED SAVINGS* $264,768 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $228,092

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,860 $6,780 $4,860
95,557
kWh
- - - -
02 2.6242: Minimize operation of equipment maintained in standby condition $20,258 $28,161 $20,258
398,300
kWh
- - - -
03 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $621 $1,288 $439
8,630
kWh
$182
-
kW-mo/yr
- - -
04 2.2447: Heat water with exhaust heat $1,331 $2,149 $501
9,855
kWh
$830
-
kW-mo/yr
- - -
05 3.5131: Recycle white water $2,598 $6,039 $1
14
kWh
- $530
-
Tgal
$2,068
-
Tgal
-
06 3.1175: Use a different or recycled raw material $217,090 $846,410 $(-32,764.4)
(-644,207)
kWh
- - - $249,854
-
gal
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,334 $255 $1,334
26,219
kWh
- - - -
08 2.4224: Upgrade controls on compressors $11,576 $32,850 $11,576
227,596
kWh
- - - -
09 2.4226: Use / purchase optimum sized compressor $4,222 $15,730 $4,222
83,018
kWh
- - - -
10 2.2437: Recover waste heat from equipment $879 $5,742 $879
17,280
kWh
- - - -
TOTAL RECOMMENDED $264,768 $945,404 $11,304
222,262
kWh
$1,012
-
kW-mo/yr
$530
-
Tgal
$2,068
-
Tgal
$249,854
-
gal
TOTAL IMPLEMENTED $228,092 $867,375 $(-25,190.1)
(-495,282)
kWh
$830
-
kW-mo/yr
$530
-
Tgal
$2,068
-
Tgal
$249,854
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs