ITAC Assessment: BS0014
ITAC logo
ITAC Assessment: BS0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Construction Equipment
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 140,000
ft2
Annual Production 225,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,307 1,383,920
kWh
Electricity Demand $26,466 4,621
kW-mo/yr
Electricity Fees $10,352 -
Natural Gas $68,498 9,893
MMBtu
Fuel Oil #2 $664 17
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,961 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Ancillary Material Cost Savings
01 2.4226: Use / purchase optimum sized compressor $5,378 $1,732 $5,378
132,186
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,556 $523 $1,556
38,251
kWh
- - - -
03 2.2447: Heat water with exhaust heat $7,448 $7,432 $(-265.6)
(-6,528)
kWh
$(-224.1)
-
kW-mo/yr
$7,938
-
MMBtu
- -
04 2.7232: Replace existing hvac unit with high efficiency model $3,948 $14,095 - - $3,948
-
MMBtu
- -
05 2.7243: Improve air circulation with destratification fans / other methods $9,647 $48,320 $125
3,061
kWh
$66
-
kW-mo/yr
$8,177
-
MMBtu
- $1,280
06 2.7135: Install occupancy sensors $94 $230 $94
2,302
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $79 $324 $79
1,940
kWh
- - - -
08 2.1321: Replace fossil fuel equipment with electrical equipment $621 $299 $(-43.4)
(-1,067)
kWh
- - $664
-
MMBtu
-
09 2.6212: Turn off equipment during breaks, reduce operating time $190 $180 $190
4,662
kWh
- - - -
TOTAL RECOMMENDED $28,961 $73,135 $7,113
174,807
kWh
$(-158.2)
-
kW-mo/yr
$20,063
-
MMBtu
$664
-
MMBtu
$1,280
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs