ITAC Assessment: UD1100
ITAC logo
ITAC Assessment: UD1100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Heat Treated and Machined Metals
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 100,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,444
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,756 2,888,783
kWh
Electricity Demand $103,910 10,849
kW-mo/yr
Electricity Fees $13,420 -
Natural Gas $12,482 833
MMBtu
Waste Disposal Costs
Water Usage $3,575 713
Tgal
Water Disposal $4,179 523
Tgal
Other Liquid (non-haz) $1,292 1
gal
TOTAL YEARLY COSTS $318,614
RECOMMENDED SAVINGS* $30,510 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $118 - $67
1,083
kWh
$51
-
kW-mo/yr
- - - -
02 2.7442: Keep doors and windows shut when not on use $1,520 $1,237 - - - $1,520
-
MMBtu
- -
03 2.7224: Reduce space conditioning during non-working hours $879 - $632
10,154
kWh
- - $247
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,770 $1,235 $1,008
16,206
kWh
$762
-
kW-mo/yr
- - - -
05 2.3212: Optimize plant power factor $12,387 $23,400 - - $12,387 - - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,587 - - $3,587
-
kW-mo/yr
- - - -
07 2.7135: Install occupancy sensors $5,242 $7,768 $1,724
27,715
kWh
$1,448
-
kW-mo/yr
- - $1,237 $833
08 2.7142: Utilize higher efficiency lamps and/or ballasts $5,007 $15,430 $1,611
25,926
kWh
$1,219
-
kW-mo/yr
- - $626 $1,551
TOTAL RECOMMENDED $30,510 $49,070 $5,042
81,084
kWh
$7,067
-
kW-mo/yr
$12,387 $1,767
-
MMBtu
$1,863 $2,384
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs