| Assessment Year | 2025 |
|---|---|
| Principal Product | Heat Treated and Machined Metals |
| NAICS | 332811: Metal Heat Treating |
| SIC | 3398: Metal Heat Treating |
| Sales Range | $5 M to 10M |
| # of Employees | 50 |
| Plant Area |
100,000
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 2,444
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $179,756 | 2,888,783 |
kWh
|
$0.062 | |
| Electricity Demand | $103,910 | 10,849 |
kW-mo/yr
|
$9.58 | |
| Electricity Fees | $13,420 | - |
|
- | |
| Natural Gas | $12,482 | 833 |
MMBtu
|
$14.98 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,575 | 713 |
Tgal
|
$5.01 | |
| Water Disposal | $4,179 | 523 |
Tgal
|
$7.99 | |
| Other Liquid (non-haz) | $1,292 | 1 |
gal
|
$1,292.00 | |
| TOTAL YEARLY COSTS | $318,614 | ||||
| RECOMMENDED SAVINGS* | $30,510 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $12,881 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $118 | $200 |
$67
1,083
kWh
|
$51
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.7442: Keep doors and windows shut when not on use | $1,520 | - | - | - | - |
$1,520
-
MMBtu
|
- | - | |
| 03 | 2.7224: Reduce space conditioning during non-working hours | $879 | - |
$632
10,154
kWh
|
- | - |
$247
-
MMBtu
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,770 | $1,000 |
$1,008
16,206
kWh
|
$762
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 2.3212: Optimize plant power factor | $12,387 | $23,400 | - | - | $12,387 | - | - | - | |
| 06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,587 | - | - |
$3,587
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 2.7135: Install occupancy sensors | $5,242 | $7,768 |
$1,724
27,715
kWh
|
$1,448
-
kW-mo/yr
|
- | - | $1,237 | $833 | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,007 | $8,000 |
$1,611
25,926
kWh
|
$1,219
-
kW-mo/yr
|
- | - | $626 | $1,551 | |
| TOTAL RECOMMENDED | $30,510 | $40,368 |
$5,042
81,084
kWh
|
$7,067
-
kW-mo/yr
|
$12,387 |
$1,767
-
MMBtu
|
$1,863 | $2,384 | ||
| TOTAL IMPLEMENTED | $12,881 | $9,200 |
$3,318
53,369
kWh
|
$5,619
-
kW-mo/yr
|
- |
$1,767
-
MMBtu
|
$626 | $1,551 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs