*See Full Grant Solicitation for full qualification and selection details.

1,094

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous primary metal products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0462 #05 Y:2025 Use solar heat to make electricty $15,563 $77,756
MI0462 #04 Y:2025 Clean or color roof to reduce solar load $4,679 $18,537
MI0462 #03 Y:2025 Install partitions to reduce size of conditioned space $5,309 $1,594
MI0462 #02 Y:2025 Lower temperature during the winter season and vice-versa $4,582 $1,260
MI0462 #01 Y:2025 Turn off equipment when not in use $15,504 $2,400
CI0049 #11 Y:2025 Use most efficient type of electric motors $918 $470
CI0049 #10 Y:2025 Use waste heat from hot flue gases to preheat $5,572 $11,000
CI0049 #09 Y:2025 Replace fossil fuel equipment with electrical equipment $9,652 $40,000
CI0049 #08 Y:2025 Use power during off-peak periods $13,567 $22,000
CI0049 #07 Y:2025 Adopt in-house material generation $13,673 $350,000
CI0049 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $14,474 $5,000
CI0049 #05 Y:2025 Adjust burners for efficient operation $18,240 $44,000
CI0049 #04 Y:2025 Use battery storage for demand control $17,261 $58,000
CI0049 #03 Y:2025 Adopt in-house material generation $18,814 $22,000
CI0049 #02 Y:2025 Replace fossil fuel equipment with electrical equipment $28,480 $125,000
CI0049 #01 Y:2025 Replace boiler $31,771 $18,000
SD0676 #11 Y:2025 Install common header on compressors $2,478 $2,050
SD0676 #10 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $9,179 $8,868
SD0676 #09 Y:2025 Utilize a less expensive cooling method $153,587 $200,000
SD0676 #08 Y:2025 Reschedule plant operations or reduce load to avoid peaks $143,491 -