Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,089

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous primary metal products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CI0049 #11 Y:2025 Use most efficient type of electric motors $918 $470
CI0049 #10 Y:2025 Preheat combustion air with waste heat $5,572 $11,000
CI0049 #09 Y:2025 Replace fossil fuel equipment with electrical equipment $9,652 $40,000
CI0049 #08 Y:2025 Use power during off-peak periods $13,567 $22,000
CI0049 #07 Y:2025 Adopt in-house material generation $13,673 $175,000
CI0049 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $14,474 $5,000
CI0049 #05 Y:2025 Adjust burners for efficient operation $16,500 $44,000
CI0049 #04 Y:2025 Use battery storage for demand control $17,261 $58,000
CI0049 #03 Y:2025 Adopt in-house material generation $18,814 $22,000
CI0049 #02 Y:2025 Replace fossil fuel equipment with electrical equipment $28,480 $125,000
CI0049 #01 Y:2025 Replace boiler $31,771 $18,000
SD0676 #11 Y:2025 Install common header on compressors $2,478 $2,050
SD0676 #10 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $9,179 $8,868
SD0676 #09 Y:2025 Utilize a less expensive cooling method $153,587 $200,000
SD0676 #08 Y:2025 Reschedule plant operations or reduce load to avoid peaks $143,491 -
SD0676 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,684 $2,699
SD0676 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $13,821 $7,047
SD0676 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $1,805 -
SD0676 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $39,510 $44,993
SD0676 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,618 $1,911