Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,058

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous primary metal products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0325 #11 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $149 $144
IC0325 #10 Y:2025 Eliminate or reduce compressed air usage $1,175 $2,940
IC0325 #09 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,137 -
IC0325 #08 Y:2025 Reduce the pressure of compressed air to the minimum required $1,716 -
IC0325 #07 Y:2025 Use waste heat from hot flue gases to preheat incoming fluids $2,149 $5,256
IC0325 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,350 $246
IC0325 #05 Y:2025 Use waste heat from flue gases to heat space conditioning air $4,795 $3,414
IC0325 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $7,318 $7,240
IC0325 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $13,138 $5,309
IC0325 #02 Y:2025 Install efficient rectifiers $8,079 $8,129
IC0325 #01 Y:2025 Use or replace with energy efficient substitutes $34,094 $58,119
UD1100 #08 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,007 $15,430
UD1100 #07 Y:2024 Install occupancy sensors $5,242 $7,768
UD1100 #06 Y:2024 Reschedule plant operations or reduce load to avoid peaks $3,587 -
UD1100 #05 Y:2024 Optimize plant power factor $12,387 $23,400
UD1100 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,770 $1,235
UD1100 #03 Y:2024 Reduce space conditioning during non-working hours $879 -
UD1100 #02 Y:2024 Keep doors and windows shut when not on use $1,520 $1,237
UD1100 #01 Y:2024 Utilize energy-efficient belts and other improved mechanisms $118 -
SJ0025 #10 Y:2024 Turn off equipment during breaks, reduce operating time $11,258 -