Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,047

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous primary metal products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1100 #08 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,007 $15,430
UD1100 #07 Y:2024 Install occupancy sensors $5,242 $7,768
UD1100 #06 Y:2024 Reschedule plant operations or reduce load to avoid peaks $3,587 -
UD1100 #05 Y:2024 Optimize plant power factor $12,387 $23,400
UD1100 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,770 $1,235
UD1100 #03 Y:2024 Reduce space conditioning during non-working hours $879 -
UD1100 #02 Y:2024 Keep doors and windows shut when not on use $1,520 $1,237
UD1100 #01 Y:2024 Utilize energy-efficient belts and other improved mechanisms $118 -
SJ0025 #10 Y:2024 Turn off equipment during breaks, reduce operating time $11,258 -
SJ0025 #09 Y:2024 Install occupancy sensors $182 $160
SJ0025 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $522 $2,897
SJ0025 #07 Y:2024 Size electric motors for peak operating efficiency $1,211 $989
SJ0025 #06 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $31,290 -
SJ0025 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $475 $125
SJ0025 #04 Y:2024 Turn off equipment when not in use $6,936 -
SJ0025 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,130 $16,703
SJ0025 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $991 -
SJ0025 #01 Y:2024 Use solar heat to make electricty $67,207 $14,360
SJ0024 #06 Y:2024 Turn off equipment when not in use $1,248 -
SJ0024 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,292 $8,243