Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

208

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Copper foundries
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UM0175 #05 Y:2000 Use optimum thickness insulation $3,029 $1,324
UM0175 #04 Y:2000 Insulate bare equipment $1,824 $2,288
UM0175 #03 Y:2000 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $4,332 $6,000
UM0175 #02 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $4,249 $600
UM0175 #01 Y:2000 Install occupancy sensors $455 $1,000
UM0172 #07 Y:2000 Apply for tax-free status for energy purchases $1,500 $3,000
UM0172 #06 Y:2000 Develop standard procedures to improve internal yields $4,000 $250
UM0172 #05 Y:2000 Recover waste heat from equipment $2,330 $1,000
UM0172 #04 Y:2000 Recover waste heat from equipment $791 $500
UM0172 #03 Y:2000 Reduce the pressure of compressed air to the minimum required $1,550 $100
UM0172 #02 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $9,562 $1,200
UM0172 #01 Y:2000 Install occupancy sensors $821 $1,000
SD0255 #09 Y:2000 Install equipment to move product $25,800 $23,000
SD0255 #08 Y:2000 Utilize daylight whenever possible in lieu of artificial light $487 $25
SD0255 #07 Y:2000 Turn off equipment when not in use $903 $40
SD0255 #06 Y:2000 Use adjustable frequency drive or multiple speed motors on existing system $1,869 $1,950
SD0255 #05 Y:2000 Turn off equipment when not in use $3,611 $350
SD0255 #04 Y:2000 Replace electrically-operated equipment with fossil fuel equipment $7,459 -
SD0255 #03 Y:2000 Use / purchase optimum sized compressor $12,615 $7,500
SD0255 #02 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $14,967 $40,000