ITAC Assessment: UM0172
ITAC logo
ITAC Assessment: UM0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Brass Castings
NAICS
n/a
SIC 3366: Copper Foundries
Sales Range $1
M
to 5
M
# of Employees 28
Plant Area 11,000
ft2
Annual Production 780
ton
Production Hrs. Annual 2,431
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,607 732,415
kWh
Electricity Fees $17,770 -
Natural Gas $21,880 4,422
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,554 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,353

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Primary Product Savings
01 2.7135: Install occupancy sensors $821 $1,000 $821
7,327
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,562 $1,200 $9,562
66,823
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,550 $100 $1,550
13,482
kWh
- - -
04 2.2437: Recover waste heat from equipment $791 $500 - - $791
-
MMBtu
-
05 2.2437: Recover waste heat from equipment $2,330 $1,000 - - $2,330
-
MMBtu
-
06 4.122: Develop standard procedures to improve internal yields $4,000 $250 - $4,000 - -
07 2.8121: Apply for tax-free status for energy purchases $1,500 $3,000 - - - $1,500
TOTAL RECOMMENDED $20,554 $7,050 $11,933
87,632
kWh
$4,000 $3,121
-
MMBtu
$1,500
TOTAL IMPLEMENTED $14,353 $1,950 $9,562
66,823
kWh
$4,000 $791
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs