ITAC Assessment: SD0255
ITAC logo
ITAC Assessment: SD0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product brass sprinklers
NAICS
n/a
SIC 3366: Copper Foundries
Sales Range $5
M
to 10
M
# of Employees 135
Plant Area 75,000
ft2
Annual Production 940,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,471 2,594,080
kWh
Electricity Demand $168,426 15,613
kW-mo/yr
Electricity Fees $2,120 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $192,575 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,652

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $124,864 $87,000 $59,592
1,091,735
kWh
$81,580
-
kW-mo/yr
$(-16,308.0)
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,967 $40,000 $3,699
67,702
kWh
$11,268
-
kW-mo/yr
- -
03 2.4226: Use / purchase optimum sized compressor $12,615 $7,500 $3,601
65,944
kWh
$9,014
-
kW-mo/yr
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,459 - $694
12,016
kWh
$6,944
-
kW-mo/yr
$(-179.0)
-
MMBtu
-
05 2.6218: Turn off equipment when not in use $3,611 $350 $2,477
54,807
kWh
$1,134
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,869 $1,950 $1,816
17,585
kWh
$53
-
kW-mo/yr
- -
07 2.6218: Turn off equipment when not in use $903 $40 $238
4,103
kWh
$665
-
kW-mo/yr
- -
08 2.7121: Utilize daylight whenever possible in lieu of artificial light $487 $25 $138
2,345
kWh
$349
-
kW-mo/yr
- -
09 4.445: Install equipment to move product $25,800 $23,000 - - - $25,800
TOTAL RECOMMENDED $192,575 $159,865 $72,255
1,316,237
kWh
$111,007
-
kW-mo/yr
$(-16,487.0)
-
MMBtu
$25,800
TOTAL IMPLEMENTED $38,652 $47,850 $10,471
200,469
kWh
$28,360
-
kW-mo/yr
$(-179.0)
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs