ITAC Assessment: GT0646
ITAC logo
ITAC Assessment: GT0646
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Computer Monitors
NAICS
n/a
SIC 3575: Computer Terminals
Sales Range greater than $500
M
# of Employees 300
Plant Area 290,000
ft2
Annual Production 1,300,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,392 3,920,868
kWh
Electricity Demand $147,916 13,374
kW-mo/yr
Electricity Fees $71,087 -
Natural Gas $41,348 7,052
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $161,896 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,980

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,713 $22,000 $3,648
144,783
kWh
$5,065
-
kW-mo/yr
- - - -
02 3.4155: Meter waste water $1,215 $1,500 - - - $1,215
-
Tgal
- -
03 3.5316: Contract a wood pallet recycling company $108,000 - - - - - $108,000
-
lb
-
04 2.3191: Use demand controller or load shedder $2,020 $2,700 - $2,020
-
kW-mo/yr
- - - -
05 2.7261: Install timers and/or thermostats $2,730 $10,050 $2,730
108,441
kWh
- - - - -
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,230 $400 $1,230
48,652
kWh
- - - - -
07 4.454: Modify startup/shutdown times $37,988 - $3,288
130,422
kWh
- $3,500
-
MMBtu
- - $31,200
TOTAL RECOMMENDED $161,896 $36,650 $10,896
432,298
kWh
$7,085
-
kW-mo/yr
$3,500
-
MMBtu
$1,215
-
Tgal
$108,000
-
lb
$31,200
TOTAL IMPLEMENTED $5,980 $13,150 $3,960
157,093
kWh
$2,020
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs