Assessment Year | 1998 |
---|---|
Principal Product | Computer Monitors |
NAICS |
n/a
|
SIC | 3575: Computer Terminals |
Sales Range | greater than $500 M |
# of Employees | 300 |
Plant Area |
290,000
ft2
|
Annual Production | 1,300,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $98,392 | 3,920,868 |
kWh
|
$0.025 |
Electricity Demand | $147,916 | 13,374 |
kW-mo/yr
|
$11.06 |
Electricity Fees | $71,087 | - |
|
- |
Natural Gas | $41,348 | 7,052 |
MMBtu
|
$5.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $161,896 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,980 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,713 | $22,000 |
$3,648
144,783
kWh
|
$5,065
-
kW-mo/yr
|
- | - | - | - | |
02 | 3.4155: Meter waste water | $1,215 | $1,500 | - | - | - |
$1,215
-
Tgal
|
- | - | |
03 | 3.5316: Contract a wood pallet recycling company | $108,000 | - | - | - | - | - |
$108,000
-
lb
|
- | |
04 | 2.3191: Use demand controller or load shedder | $2,020 | $2,700 | - |
$2,020
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7261: Install timers and/or thermostats | $2,730 | $10,050 |
$2,730
108,441
kWh
|
- | - | - | - | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,230 | $400 |
$1,230
48,652
kWh
|
- | - | - | - | - | |
07 | 4.454: Modify startup/shutdown times | $37,988 | - |
$3,288
130,422
kWh
|
- |
$3,500
-
MMBtu
|
- | - | $31,200 | |
TOTAL RECOMMENDED | $161,896 | $36,650 |
$10,896
432,298
kWh
|
$7,085
-
kW-mo/yr
|
$3,500
-
MMBtu
|
$1,215
-
Tgal
|
$108,000
-
lb
|
$31,200 | ||
TOTAL IMPLEMENTED | $5,980 | $13,150 |
$3,960
157,093
kWh
|
$2,020
-
kW-mo/yr
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs