Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

208

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Copper foundries
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0320 #02 Y:2005 Utilize higher efficiency lamps and/or ballasts $4,978 $5,805
WV0320 #01 Y:2005 Utilize higher efficiency lamps and/or ballasts $15,626 $30,000
LE0200 #11 Y:2004 Make a practice of turning off lights when not needed $657 $380
LE0200 #10 Y:2004 Use optimum thickness insulation $768 $300
LE0200 #09 Y:2004 Improve combustion control capability $857 $200
LE0200 #08 Y:2004 Install compressor air intakes in coolest locations $904 $500
LE0200 #07 Y:2004 Utilize energy-efficient belts and other improved mechanisms $1,132 $400
LE0200 #06 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $1,198 -
LE0200 #05 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $1,266 $750
LE0200 #04 Y:2004 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,878 $4,000
LE0200 #03 Y:2004 Re-size charging openings or add movable cover or door $3,305 $800
LE0200 #02 Y:2004 Air condition only space necessary $9,386 $360
LE0200 #01 Y:2004 Reschedule plant operations or reduce load to avoid peaks $18,210 $3,000
LM0080 #07 Y:2004 Utilize daylight whenever possible in lieu of artificial light $869 -
LM0080 #06 Y:2004 Reschedule plant operations or reduce load to avoid peaks $23,164 $300
LM0080 #05 Y:2004 Replace existing equipment with more suitable substitutes $3,467 $6,000
LM0080 #04 Y:2004 Re-arrange equipment layout to reduce labor costs $28,600 $20,592
LM0080 #03 Y:2004 Adjust burners for efficient operation $537 -
LM0080 #02 Y:2004 Remove or close off unneeded compressed air lines $266 $165
LM0080 #01 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $621 $475