208
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Copper foundries | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0320 #02 Y:2005 | 02 | 2005 | Utilize higher efficiency lamps and/or ballasts | $4,978 | $5,805 | |
| WV0320 #01 Y:2005 | 01 | 2005 | Utilize higher efficiency lamps and/or ballasts | $15,626 | $30,000 | |
| LE0200 #11 Y:2004 | 11 | 2004 | Make a practice of turning off lights when not needed | $657 | $380 | |
| LE0200 #10 Y:2004 | 10 | 2004 | Use optimum thickness insulation | $768 | $300 | |
| LE0200 #09 Y:2004 | 09 | 2004 | Improve combustion control capability | $857 | $200 | |
| LE0200 #08 Y:2004 | 08 | 2004 | Install compressor air intakes in coolest locations | $904 | $500 | |
| LE0200 #07 Y:2004 | 07 | 2004 | Utilize energy-efficient belts and other improved mechanisms | $1,132 | $400 | |
| LE0200 #06 Y:2004 | 06 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,198 | - | |
| LE0200 #05 Y:2004 | 05 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,266 | $750 | |
| LE0200 #04 Y:2004 | 04 | 2004 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $1,878 | $4,000 | |
| LE0200 #03 Y:2004 | 03 | 2004 | Re-size charging openings or add movable cover or door | $3,305 | $800 | |
| LE0200 #02 Y:2004 | 02 | 2004 | Air condition only space necessary | $9,386 | $360 | |
| LE0200 #01 Y:2004 | 01 | 2004 | Reschedule plant operations or reduce load to avoid peaks | $18,210 | $3,000 | |
| LM0080 #07 Y:2004 | 07 | 2004 | Utilize daylight whenever possible in lieu of artificial light | $869 | - | |
| LM0080 #06 Y:2004 | 06 | 2004 | Reschedule plant operations or reduce load to avoid peaks | $23,164 | $300 | |
| LM0080 #05 Y:2004 | 05 | 2004 | Replace existing equipment with more suitable substitutes | $3,467 | $6,000 | |
| LM0080 #04 Y:2004 | 04 | 2004 | Re-arrange equipment layout to reduce labor costs | $28,600 | $20,592 | |
| LM0080 #03 Y:2004 | 03 | 2004 | Adjust burners for efficient operation | $537 | - | |
| LM0080 #02 Y:2004 | 02 | 2004 | Remove or close off unneeded compressed air lines | $266 | $165 | |
| LM0080 #01 Y:2004 | 01 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $621 | $475 |