Assessment Year | 2004 |
---|---|
Principal Product | Al bronze brass castings |
NAICS | 331529: Other Nonferrous Metal Foundries (except Die-Casting) |
SIC | 3366: Copper Foundries |
Sales Range | $5 M to 10M |
# of Employees | 55 |
Plant Area |
20,000
ft2
|
Annual Production | 800,000
lb
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $85,034 | 889,183 |
kWh
|
$0.096 |
Electricity Demand | $69,151 | 5,988 |
kW-mo/yr
|
$11.55 |
Natural Gas | $21,625 | 2,648 |
MMBtu
|
$8.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,524 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,322 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $621 | $475 |
$364
3,460
kWh
|
$257
-
kW-mo/yr
|
- | - | |
02 | 2.4235: Remove or close off unneeded compressed air lines | $266 | $165 |
$266
2,525
kWh
|
- | - | - | |
03 | 2.1133: Adjust burners for efficient operation | $537 | - | - | - |
$537
-
MMBtu
|
- | |
04 | 4.513: Re-arrange equipment layout to reduce labor costs | $28,600 | $20,592 | - | - | - | $28,600 | |
05 | 4.652: Replace existing equipment with more suitable substitutes | $3,467 | $6,000 | - | - | - | $3,467 | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $23,164 | $300 |
$3,771
-
kWh
|
$25,018
-
kW-mo/yr
|
- | $(-5,625.0) | |
07 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $869 | - |
$510
4,838
kWh
|
$359
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $57,524 | $27,532 |
$4,911
10,823
kWh
|
$25,634
-
kW-mo/yr
|
$537
-
MMBtu
|
$26,442 | ||
TOTAL IMPLEMENTED | $24,322 | $775 |
$4,135
3,460
kWh
|
$25,275
-
kW-mo/yr
|
$537
-
MMBtu
|
$(-5,625.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs