Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aluminum foundries
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0450 #08 Y:2003 Turn off equipment during breaks, reduce operating time $130 -
AM0450 #07 Y:2003 Improve process control to prevent spills of material $140 $40
AM0450 #06 Y:2003 Pay bills on time to avoid late fees $194 -
AM0450 #05 Y:2003 Reduce / eliminate use of disposable product $920 $700
AM0450 #04 Y:2003 Install skylights $1,100 $830
AM0450 #03 Y:2003 Reduce the pressure of compressed air to the minimum required $1,975 $25
AM0450 #02 Y:2003 Change rate schedules or other changes in utility service $2,380 -
AM0450 #01 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $3,200 $580
AM0222 #07 Y:1994 Insulate bare equipment $540 $150
AM0222 #06 Y:1994 Pay utility bills on time $722 -
AM0222 #05 Y:1994 Install skylights $1,580 $1,000
AM0222 #04 Y:1994 Make a practice of turning off lights when not needed $2,470 -
AM0222 #03 Y:1994 Eliminate leaks in inert gas and compressed air lines/ valves $2,400 $740
AM0222 #02 Y:1994 Reschedule plant operations or reduce load to avoid peaks $4,300 $1,400
AM0222 #01 Y:1994 Cover open tanks $10,970 $1,000
AM0133 #06 Y:1991 Use heat from boiler blowdown to preheat boiler feed water $245 $635
AM0133 #05 Y:1991 Utilize higher efficiency lamps and/or ballasts $120 -
AM0133 #04 Y:1991 Eliminate leaks in inert gas and compressed air lines/ valves $690 $300
AM0133 #03 Y:1991 Use demand controller or load shedder $750 $627
AM0133 #02 Y:1991 Recover waste heat from equipment $1,770 $845