ITAC Assessment: AM0133
ITAC logo
ITAC Assessment: AM0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ALUMINUM ALLOY AIRCRAFT
NAICS
n/a
SIC 3365: Aluminum Foundries
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 10,000,000
pieces
Production Hrs. Annual 5,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,903 4,303,341
kWh
Natural Gas $45,151 10,875
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,175 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $6,600 $12,670 - $6,600
-
MMBtu
-
02 2.2437: Recover waste heat from equipment $1,770 $845 $1,770
72,392
kWh
- -
03 2.3191: Use demand controller or load shedder $750 $627 $750
-
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $690 $300 $690
28,136
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $120 - $190
2,638
kWh
- $(-70.0)
06 2.1243: Use heat from boiler blowdown to preheat boiler feed water $245 $635 - $245
-
MMBtu
-
TOTAL RECOMMENDED $10,175 $15,077 $3,400
103,166
kWh
$6,845
-
MMBtu
$(-70.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs