Assessment Year | 1991 |
---|---|
Principal Product | ALUMINUM ALLOY AIRCRAFT |
NAICS |
n/a
|
SIC | 3365: Aluminum Foundries |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
n/a
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $219,903 | 4,303,341 |
kWh
|
$0.051 |
Natural Gas | $45,151 | 10,875 |
MMBtu
|
$4.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,175 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $6,600 | $12,670 | - |
$6,600
-
MMBtu
|
- | |
02 | 2.2437: Recover waste heat from equipment | $1,770 | $845 |
$1,770
72,392
kWh
|
- | - | |
03 | 2.3191: Use demand controller or load shedder | $750 | $627 |
$750
-
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $690 | $300 |
$690
28,136
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $120 | - |
$190
2,638
kWh
|
- | $(-70.0) | |
06 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $245 | $635 | - |
$245
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $10,175 | $15,077 |
$3,400
103,166
kWh
|
$6,845
-
MMBtu
|
$(-70.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs