| Assessment Year | 1991 |
|---|---|
| Principal Product | ALUMINUM ALLOY AIRCRAFT |
| NAICS |
n/a
|
| SIC | 3365: Aluminum Foundries |
| Sales Range | $10 M to 50M |
| # of Employees | 140 |
| Plant Area |
n/a
|
| Annual Production | 10,000,000
pieces
|
| Production Hrs. Annual | 5,760
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $219,903 | 4,303,341 |
kWh
|
$0.051 |
| Natural Gas | $45,151 | 10,875 |
MMBtu
|
$4.15 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,175 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $6,600 | $12,670 | - |
$6,600
-
MMBtu
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $1,770 | $845 |
$1,770
72,392
kWh
|
- | - | |
| 03 | 2.3191: Use demand controller or load shedder | $750 | $627 |
$750
-
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $690 | $300 |
$690
28,136
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $120 | - |
$190
2,638
kWh
|
- | $(-70.0) | |
| 06 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $245 | $635 | - |
$245
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $10,175 | $15,077 |
$3,400
103,166
kWh
|
$6,845
-
MMBtu
|
$(-70.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs