ITAC Assessment: AM0450
ITAC logo
ITAC Assessment: AM0450
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Aluminum castings
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3365: Aluminum Foundries
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 40,000
ft2
Annual Production 1,930,000
lb
Production Hrs. Annual 4,890
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,200 1,512
kWh
Electricity Demand $11,762 1,740
kW-mo/yr
Electricity Fees $194 -
Natural Gas $55,940 443,400
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,039 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,634

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,200 $580 $3,200
58,100
kWh
- - -
02 2.8114: Change rate schedules or other changes in utility service $2,380 - - - - $2,380
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,975 $25 $1,975
35,900
kWh
- - -
04 2.7145: Install skylights $1,100 $830 $1,100
20,000
kWh
- - -
05 3.7198: Reduce / eliminate use of disposable product $920 $700 - $920
-
lb
- -
06 4.821: Pay bills on time to avoid late fees $194 - - - - $194
07 3.7221: Improve process control to prevent spills of material $140 $40 - - $140 -
08 2.6212: Turn off equipment during breaks, reduce operating time $130 - $130
2,300
kWh
- - -
TOTAL RECOMMENDED $10,039 $2,175 $6,405
116,300
kWh
$920
-
lb
$140 $2,574
TOTAL IMPLEMENTED $4,634 $1,450 $4,300
78,100
kWh
- $140 $194
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs