ITAC Assessment: NV0143
ITAC logo
ITAC Assessment: NV0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Seals and Gaskets
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 55,000
ft2
Annual Production 400,000
pieces
Production Hrs. Annual 2,412
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,836 403,283
kWh
Electricity Demand $13,558 1,461
kW-mo/yr
Electricity Fees $1,239 -
Natural Gas $11,391 2,175
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,947 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,278

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $314 $661 $236
5,569
kWh
$72
-
kW-mo/yr
$6 - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $852 $2,475 $391
9,379
kWh
$444
-
kW-mo/yr
$17 - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,112 $7,124 $975
23,447
kWh
$1,096
-
kW-mo/yr
$41 - -
04 2.7243: Improve air circulation with destratification fans / other methods $3,838 $3,838 $(-264.0)
(-6,448)
kWh
$(-82.0)
-
kW-mo/yr
$(-7.0) $4,191
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $3,860 $1,350 $653
8,206
kWh
- - $3,207
-
MMBtu
-
06 3.6192: Use a less expensive method of waste removal $1,971 $970 - - - - $1,971
-
lb
TOTAL RECOMMENDED $12,947 $16,418 $1,991
40,153
kWh
$1,530
-
kW-mo/yr
$57 $7,398
-
MMBtu
$1,971
-
lb
TOTAL IMPLEMENTED $3,278 $10,260 $1,602
38,395
kWh
$1,612
-
kW-mo/yr
$64 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs