Assessment Year | 1999 |
---|---|
Principal Product | Anodizing metals |
NAICS |
n/a
|
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
100,000
ft2
|
Annual Production | 350,000,000
pieces
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $340,240 | 6,192,556 |
kWh
|
$0.055 |
Electricity Demand | $185,600 | 29,385 |
kW-mo/yr
|
$6.32 |
Electricity Fees | $(-18,479.0) | - |
|
- |
Natural Gas | $144,372 | 27,054 |
MMBtu
|
$5.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $64,861 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,436 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,818 | $7,776 |
$2,212
40,152
kWh
|
$606
-
kW-mo/yr
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $3,223 | $3,065 |
$3,223
58,617
kWh
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $944 | $1,500 |
$762
13,775
kWh
|
$182
-
kW-mo/yr
|
- | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $451 | $100 | - | - |
$451
-
MMBtu
|
- | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $7,395 | $4,800 | - | - |
$7,395
-
MMBtu
|
- | |
06 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $14,628 | $8,000 | - | - |
$14,628
-
MMBtu
|
- | |
07 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $25,402 | $22,000 | - | - |
$25,402
-
MMBtu
|
- | |
08 | 4.441: Install automatic packing equipment | $10,000 | $35,000 | - | - | - | $10,000 | |
TOTAL RECOMMENDED | $64,861 | $82,241 |
$6,197
112,544
kWh
|
$788
-
kW-mo/yr
|
$47,876
-
MMBtu
|
$10,000 | ||
TOTAL IMPLEMENTED | $13,436 | $15,641 |
$5,435
98,769
kWh
|
$606
-
kW-mo/yr
|
$7,395
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs