ITAC Assessment: HO0200
ITAC logo
ITAC Assessment: HO0200
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Anodizing metals
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 100,000
ft2
Annual Production 350,000,000
pieces
Production Hrs. Annual 5,760
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $340,240 6,192,556
kWh
Electricity Demand $185,600 29,385
kW-mo/yr
Electricity Fees $(-18,479.0) -
Natural Gas $144,372 27,054
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,861 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,436

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,818 $7,776 $2,212
40,152
kWh
$606
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $3,223 $3,065 $3,223
58,617
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $944 $1,500 $762
13,775
kWh
$182
-
kW-mo/yr
- -
04 2.2414: Use waste heat from hot flue gases to preheat $451 $100 - - $451
-
MMBtu
-
05 2.7243: Improve air circulation with destratification fans / other methods $7,395 $4,800 - - $7,395
-
MMBtu
-
06 2.2449: Recover heat from exhausted steam, hot air or hot water $14,628 $8,000 - - $14,628
-
MMBtu
-
07 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $25,402 $22,000 - - $25,402
-
MMBtu
-
08 4.441: Install automatic packing equipment $10,000 $35,000 - - - $10,000
TOTAL RECOMMENDED $64,861 $82,241 $6,197
112,544
kWh
$788
-
kW-mo/yr
$47,876
-
MMBtu
$10,000
TOTAL IMPLEMENTED $13,436 $15,641 $5,435
98,769
kWh
$606
-
kW-mo/yr
$7,395
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs