ITAC Assessment: UF0600
ITAC logo
ITAC Assessment: UF0600
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Joint Treatment Compound
NAICS 327420: Gypsum Product Manufacturing
SIC 3275: Gypsum Products
Sales Range $50
M
to 100
M
# of Employees 32
Plant Area 81,225
ft2
Annual Production 18,200
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,768 2,109,234
kWh
Electricity Demand $64,604 24,531
kW-mo/yr
Electricity Fees $48,315 -
TOTAL YEARLY COSTS $274,687
RECOMMENDED SAVINGS* $82,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,152

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.3191: Use demand controller or load shedder $20,830 $11,347 $16,241
210,923
kWh
$4,589
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $17,863 $38,735 $14,822
192,492
kWh
$3,041
-
kW-mo/yr
-
03 2.4112: Install soft-start to eliminate nuisance trips $4,976 $11,866 $4,976
64,622
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,508 $584 $4,508
58,548
kWh
- -
05 2.2623: Minimize condenser cooling water temperature $1,132 $1,440 $1,132
14,700
kWh
- -
06 2.7132: Install timers on light switches in little used areas $1,118 $591 $1,118
14,515
kWh
- -
07 4.424: Improve space comfort conditioning $32,555 $3,179 $(-321.0)
(-4,165)
kWh
$(-111.0)
-
kW-mo/yr
$32,987
TOTAL RECOMMENDED $82,982 $67,742 $42,476
551,635
kWh
$7,519
-
kW-mo/yr
$32,987
TOTAL IMPLEMENTED $62,152 $56,395 $26,235
340,712
kWh
$2,930
-
kW-mo/yr
$32,987
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs