Assessment Year | 2023 |
---|---|
Principal Product | Joint Treatment Compound |
NAICS | 327420: Gypsum Product Manufacturing |
SIC | 3275: Gypsum Products |
Sales Range | $50 M to 100M |
# of Employees | 32 |
Plant Area |
81,225
ft2
|
Annual Production | 18,200
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $161,768 | 2,109,234 |
kWh
|
$0.077 |
Electricity Demand | $64,604 | 24,531 |
kW-mo/yr
|
$2.63 |
Electricity Fees | $48,315 | - |
|
- |
TOTAL YEARLY COSTS | $274,687 | |||
RECOMMENDED SAVINGS* | $82,982 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $62,152 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $20,830 | $11,347 |
$16,241
210,923
kWh
|
$4,589
-
kW-mo/yr
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $17,863 | $38,735 |
$14,822
192,492
kWh
|
$3,041
-
kW-mo/yr
|
- | |
03 | 2.4112: Install soft-start to eliminate nuisance trips | $4,976 | $11,866 |
$4,976
64,622
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,508 | $584 |
$4,508
58,548
kWh
|
- | - | |
05 | 2.2623: Minimize condenser cooling water temperature | $1,132 | $1,440 |
$1,132
14,700
kWh
|
- | - | |
06 | 2.7132: Install timers on light switches in little used areas | $1,118 | $591 |
$1,118
14,515
kWh
|
- | - | |
07 | 4.424: Improve space comfort conditioning | $32,555 | $3,179 |
$(-321.0)
(-4,165)
kWh
|
$(-111.0)
-
kW-mo/yr
|
$32,987 | |
TOTAL RECOMMENDED | $82,982 | $67,742 |
$42,476
551,635
kWh
|
$7,519
-
kW-mo/yr
|
$32,987 | ||
TOTAL IMPLEMENTED | $62,152 | $56,395 |
$26,235
340,712
kWh
|
$2,930
-
kW-mo/yr
|
$32,987 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs