IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Electric light assemblies
NAICS
n/a
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 435,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,123 4,582,943
kWh
Electricity Demand $68,486 8,352
kW-mo/yr
Electricity Fees $120 -
Natural Gas $43,214 6,505
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,598 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings By-product Production Savings
01 2.2437: Recover waste heat from equipment $541 $800 - - $541
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $16,691 $18,850 $16,691
634,818
kWh
- - - -
03 2.7131: Add area lighting switches $91 $300 $91
3,810
kWh
- - - -
04 2.7124: Make a practice of turning off lights when not needed $3,508 $500 $1,146
48,652
kWh
$2,362
-
kW-mo/yr
- - -
05 2.7145: Install skylights $10,344 $36,000 $4,342
184,056
kWh
$6,002
-
kW-mo/yr
- - -
06 2.2711: Utilize outside air instead of conditioned air for drying $3,423 $3,000 $879
33,411
kWh
$1,984
-
kW-mo/yr
- $560 -
07 4.521: Clear and rent existing space $28,000 $20,500 - - - - $28,000
TOTAL RECOMMENDED $62,598 $79,950 $23,149
904,747
kWh
$10,348
-
kW-mo/yr
$541
-
MMBtu
$560 $28,000
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs