Assessment Year | 1998 |
---|---|
Principal Product | Electric light assemblies |
NAICS |
n/a
|
SIC | 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures |
Sales Range | $10 M to 50M |
# of Employees | 210 |
Plant Area |
435,000
ft2
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $108,123 | 4,582,943 |
kWh
|
$0.024 |
Electricity Demand | $68,486 | 8,352 |
kW-mo/yr
|
$8.20 |
Electricity Fees | $120 | - |
|
- |
Natural Gas | $43,214 | 6,505 |
MMBtu
|
$6.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $62,598 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $541 | $800 | - | - |
$541
-
MMBtu
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,691 | $18,850 |
$16,691
634,818
kWh
|
- | - | - | - | |
03 | 2.7131: Add area lighting switches | $91 | $300 |
$91
3,810
kWh
|
- | - | - | - | |
04 | 2.7124: Make a practice of turning off lights when not needed | $3,508 | $500 |
$1,146
48,652
kWh
|
$2,362
-
kW-mo/yr
|
- | - | - | |
05 | 2.7145: Install skylights | $10,344 | $36,000 |
$4,342
184,056
kWh
|
$6,002
-
kW-mo/yr
|
- | - | - | |
06 | 2.2711: Utilize outside air instead of conditioned air for drying | $3,423 | $3,000 |
$879
33,411
kWh
|
$1,984
-
kW-mo/yr
|
- | $560 | - | |
07 | 4.521: Clear and rent existing space | $28,000 | $20,500 | - | - | - | - | $28,000 | |
TOTAL RECOMMENDED | $62,598 | $79,950 |
$23,149
904,747
kWh
|
$10,348
-
kW-mo/yr
|
$541
-
MMBtu
|
$560 | $28,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs