127
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Aluminum die-castings | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1040 #10 Y:2022 | 10 | 2022 | Reduce space conditioning during non-working hours | $5,313 | - | |
| UD1040 #09 Y:2022 | 09 | 2022 | Reduce ventilation air | $201,271 | $872,653 | |
| UD1040 #08 Y:2022 | 08 | 2022 | Utilize higher efficiency lamps and/or ballasts | $37,768 | $58,100 | |
| UD1040 #07 Y:2022 | 07 | 2022 | Install occupancy sensors | $13,562 | $11,900 | |
| UD1040 #06 Y:2022 | 06 | 2022 | Optimize plant power factor | $45,386 | $62,689 | |
| UD1040 #05 Y:2022 | 05 | 2022 | Meter recycled water (to reduce sewer charges) | $146,536 | $40,000 | |
| UD1040 #04 Y:2022 | 04 | 2022 | Meter recycled water (to reduce sewer charges) | $78,304 | $700 | |
| UD1040 #03 Y:2022 | 03 | 2022 | Reduce ventilation air | $8,723 | - | |
| UD1040 #02 Y:2022 | 02 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,896 | $453 | |
| UD1040 #01 Y:2022 | 01 | 2022 | Cover open tanks | $3,104 | - | |
| UD0948 #12 Y:2016 | 12 | 2016 | Use closed cycle process to minimize waste water production | $195,456 | $17,000 | |
| UD0948 #11 Y:2016 | 11 | 2016 | Utilize higher efficiency lamps and/or ballasts | $64,945 | $360,069 | |
| UD0948 #10 Y:2016 | 10 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $2,006 | $5,000 | |
| UD0948 #09 Y:2016 | 09 | 2016 | Meter recycled water (to reduce sewer charges) | $105,009 | $700 | |
| UD0948 #08 Y:2016 | 08 | 2016 | Optimize plant power factor | $11,880 | $60,000 | |
| UD0948 #07 Y:2016 | 07 | 2016 | Lower temperature during the winter season and vice-versa | $38,094 | - | |
| UD0948 #06 Y:2016 | 06 | 2016 | Improve air circulation with destratification fans / other methods | $87,713 | $52,000 | |
| UD0948 #05 Y:2016 | 05 | 2016 | Reduce the pressure of compressed air to the minimum required | $2,997 | $50 | |
| UD0948 #04 Y:2016 | 04 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $35,398 | - | |
| UD0948 #03 Y:2016 | 03 | 2016 | Recover waste heat from equipment | $49,905 | $20,000 |