Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,134

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aluminum die-castings
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2607 #09 Y:2026 Use solar heat to make electricty $99,750 $931,817
UL2607 #08 Y:2026 Use outside cold water source as a supply of cooling water $96,011 $58,367
UL2607 #07 Y:2026 Repair faulty insulation in furnaces, boilers, etc $13,403 $2,331
UL2607 #06 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $127,021 $112,125
UL2607 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $15,357 $3,420
UL2607 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $8,706 -
UL2607 #03 Y:2026 Recover waste heat from equipment $11,262 $25,000
UL2607 #02 Y:2026 Lower temperature during the winter season and vice-versa $1,596 $1,000
UL2607 #01 Y:2026 Lower ceiling to reduce conditioned space $27,920 $24,000
SF0644 #12 Y:2025 Use solar heat to make electricty $139,427 $781,676
SF0644 #11 Y:2025 Use battery storage for demand control $39,673 $145,800
SF0644 #10 Y:2025 Utilize higher efficiency lamps and/or ballasts $13,685 $23,706
SF0644 #09 Y:2025 Change rate schedules or other changes in utility service $87,216 $146,113
SF0644 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $9,207 $8,069
SF0644 #07 Y:2025 Re-size charging openings or add movable cover or door $8,178 $5,000
SF0644 #06 Y:2025 Repair faulty insulation in furnaces, boilers, etc $11,403 $3,643
SF0644 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $1,268 $350
SF0644 #04 Y:2025 Reduce space conditioning during non-working hours $11,683 $2,000
SF0644 #03 Y:2025 Use demand controller or load shedder $69,072 -
SF0644 #02 Y:2025 Turn off equipment when not in use $1,847 -