1,106
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Aluminum die-castings | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
TT0296 #11 Y:2023 | 11 | 2023 | Cool compressor air intake with heat exchanger | $2,853 | $7,500 | |
TT0296 #10 Y:2023 | 10 | 2023 | Change rate schedules or other changes in utility service | $203,680 | $300,000 | |
TT0296 #09 Y:2023 | 09 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $7,690 | $8,100 | |
TT0296 #08 Y:2023 | 08 | 2023 | Eliminate or reduce compressed air usage | $5,078 | $4,500 | |
TT0296 #07 Y:2023 | 07 | 2023 | Optimize plant power factor | $41,037 | $32,500 | |
TT0296 #06 Y:2023 | 06 | 2023 | Replace existing equipment with more suitable substitutes | $81,000 | $60,000 | |
TT0296 #05 Y:2023 | 05 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,264 | $1,920 | |
TT0296 #04 Y:2023 | 04 | 2023 | Upgrade controls on compressors | $22,207 | $1,640 | |
TT0296 #03 Y:2023 | 03 | 2023 | Use a less expensive method of waste removal | $200,000 | $10,000 | |
TT0296 #02 Y:2023 | 02 | 2023 | Begin a practice of predictive / preventative maintenance | $66,640 | $2,000 | |
TT0296 #01 Y:2023 | 01 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $23,069 | $270 | |
WM0194 #09 Y:2023 | 09 | 2023 | Close holes and openings in building such as broken windows | $9,970 | $2,832 | |
WM0194 #08 Y:2023 | 08 | 2023 | Replace existing hvac unit with high efficiency model | $14,050 | $20,480 | |
WM0194 #07 Y:2023 | 07 | 2023 | Replace hydraulic / pneumatic equipment with electric equipment | $15,440 | $9,000 | |
WM0194 #06 Y:2023 | 06 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $35,203 | $110,000 | |
WM0194 #05 Y:2023 | 05 | 2023 | Eliminate or reduce compressed air usage | $38,839 | $6,800 | |
WM0194 #04 Y:2023 | 04 | 2023 | Pay bills on time to avoid late fees | $41,818 | - | |
WM0194 #03 Y:2023 | 03 | 2023 | Utilize higher efficiency lamps and/or ballasts | $41,924 | $39,795 | |
WM0194 #02 Y:2023 | 02 | 2023 | Replace city water with recycled water via cooling tower | $161,122 | $300,000 | |
WM0194 #01 Y:2023 | 01 | 2023 | Use waste heat from hot flue gases to preheat | $202,110 | $250,000 |