Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,106

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aluminum die-castings
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0296 #11 Y:2023 Cool compressor air intake with heat exchanger $2,853 $7,500
TT0296 #10 Y:2023 Change rate schedules or other changes in utility service $203,680 $300,000
TT0296 #09 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $7,690 $8,100
TT0296 #08 Y:2023 Eliminate or reduce compressed air usage $5,078 $4,500
TT0296 #07 Y:2023 Optimize plant power factor $41,037 $32,500
TT0296 #06 Y:2023 Replace existing equipment with more suitable substitutes $81,000 $60,000
TT0296 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $3,264 $1,920
TT0296 #04 Y:2023 Upgrade controls on compressors $22,207 $1,640
TT0296 #03 Y:2023 Use a less expensive method of waste removal $200,000 $10,000
TT0296 #02 Y:2023 Begin a practice of predictive / preventative maintenance $66,640 $2,000
TT0296 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $23,069 $270
WM0194 #09 Y:2023 Close holes and openings in building such as broken windows $9,970 $2,832
WM0194 #08 Y:2023 Replace existing hvac unit with high efficiency model $14,050 $20,480
WM0194 #07 Y:2023 Replace hydraulic / pneumatic equipment with electric equipment $15,440 $9,000
WM0194 #06 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $35,203 $110,000
WM0194 #05 Y:2023 Eliminate or reduce compressed air usage $38,839 $6,800
WM0194 #04 Y:2023 Pay bills on time to avoid late fees $41,818 -
WM0194 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $41,924 $39,795
WM0194 #02 Y:2023 Replace city water with recycled water via cooling tower $161,122 $300,000
WM0194 #01 Y:2023 Use waste heat from hot flue gases to preheat $202,110 $250,000