Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

127

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aluminum die-castings
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1040 #10 Y:2022 Reduce space conditioning during non-working hours $5,313 -
UD1040 #09 Y:2022 Reduce ventilation air $201,271 $872,653
UD1040 #08 Y:2022 Utilize higher efficiency lamps and/or ballasts $37,768 $58,100
UD1040 #07 Y:2022 Install occupancy sensors $13,562 $11,900
UD1040 #06 Y:2022 Optimize plant power factor $45,386 $62,689
UD1040 #05 Y:2022 Meter recycled water (to reduce sewer charges) $146,536 $40,000
UD1040 #04 Y:2022 Meter recycled water (to reduce sewer charges) $78,304 $700
UD1040 #03 Y:2022 Reduce ventilation air $8,723 -
UD1040 #02 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $12,896 $453
UD1040 #01 Y:2022 Cover open tanks $3,104 -
UD0948 #12 Y:2016 Use closed cycle process to minimize waste water production $195,456 $17,000
UD0948 #11 Y:2016 Utilize higher efficiency lamps and/or ballasts $64,945 $360,069
UD0948 #10 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $2,006 $5,000
UD0948 #09 Y:2016 Meter recycled water (to reduce sewer charges) $105,009 $700
UD0948 #08 Y:2016 Optimize plant power factor $11,880 $60,000
UD0948 #07 Y:2016 Lower temperature during the winter season and vice-versa $38,094 -
UD0948 #06 Y:2016 Improve air circulation with destratification fans / other methods $87,713 $52,000
UD0948 #05 Y:2016 Reduce the pressure of compressed air to the minimum required $2,997 $50
UD0948 #04 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $35,398 -
UD0948 #03 Y:2016 Recover waste heat from equipment $49,905 $20,000