Assessment Year | 2012 |
---|---|
Principal Product | Aluminum and Zinc Die Castings |
NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
SIC | 3363: Aluminum Die-Castings |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
85,000
ft2
|
Annual Production | 4,300,000
lb
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $143,480 | 2,117,045 |
kWh
|
$0.068 |
Electricity Demand | $82,698 | 10,025 |
kW-mo/yr
|
$8.25 |
Electricity Fees | $1,984 | - |
|
- |
Natural Gas | $187,430 | 35,647 |
MMBtu
|
$5.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,117 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1213: Direct warmest air to combustion intake | $5,714 | $4,000 |
$(-591.0)
(-8,713)
kWh
|
$(-289.0)
-
kW-mo/yr
|
$6,594
-
MMBtu
|
- | - | |
02 | 2.7231: Use radiant heater for spot heating | $2,245 | $3,000 | - | - |
$2,245
-
MMBtu
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,061 | $500 |
$723
10,666
kWh
|
$338
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $857 | $2,925 |
$584
8,611
kWh
|
$273
-
kW-mo/yr
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $756 | $2,100 |
$461
6,800
kWh
|
$295
-
kW-mo/yr
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $746 | $20 |
$515
7,590
kWh
|
$231
-
kW-mo/yr
|
- | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $608 | $3,000 |
$121
1,773
kWh
|
$487
-
kW-mo/yr
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $130 | $275 |
$35
505
kWh
|
$16
-
kW-mo/yr
|
- | $53 | $26 | |
TOTAL RECOMMENDED | $12,117 | $15,820 |
$1,848
27,233
kWh
|
$1,351
-
kW-mo/yr
|
$8,839
-
MMBtu
|
$53 | $26 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs