122
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LM0028 #10 Y:2001 | 10 | 2001 | Develop standard operating procedures | $15,600 | $1,780 | |
| LM0028 #09 Y:2001 | 09 | 2001 | Install system to collect scrap | $23,190 | $13,500 | |
| LM0028 #08 Y:2001 | 08 | 2001 | Modify workload | $202,176 | $2,200 | |
| LM0028 #07 Y:2001 | 07 | 2001 | Use adjustable frequency drive or multiple speed motors on existing system | $147,649 | $242,050 | |
| LM0028 #06 Y:2001 | 06 | 2001 | Use most efficient type of electric motors | $9,289 | $14,371 | |
| LM0028 #05 Y:2001 | 05 | 2001 | Install skylights | $5,597 | $10,400 | |
| LM0028 #04 Y:2001 | 04 | 2001 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,807 | $800 | |
| LM0028 #03 Y:2001 | 03 | 2001 | Use waste heat from hot flue gases to preheat | $49,880 | $53,000 | |
| LM0028 #02 Y:2001 | 02 | 2001 | Insulate bare equipment | $4,363 | $2,200 | |
| LM0028 #01 Y:2001 | 01 | 2001 | Insulate bare equipment | $10,685 | $980 | |
| LM0024 #08 Y:2001 | 08 | 2001 | Replace existing equipment with more suitable substitutes | $47,320 | - | |
| LM0024 #07 Y:2001 | 07 | 2001 | Replace existing equipment with more suitable substitutes | $166,320 | $100,000 | |
| LM0024 #06 Y:2001 | 06 | 2001 | Modify process to reduce material use/cost | $237,600 | - | |
| LM0024 #05 Y:2001 | 05 | 2001 | Clear and rent existing space | $110,000 | $4,500 | |
| LM0024 #04 Y:2001 | 04 | 2001 | Improve combustion control capability | $3,312 | $1,600 | |
| LM0024 #03 Y:2001 | 03 | 2001 | Reduce illumination to minimum necessary levels | $11,155 | - | |
| LM0024 #02 Y:2001 | 02 | 2001 | Utilize energy-efficient belts and other improved mechanisms | $8,154 | $3,000 | |
| LM0024 #01 Y:2001 | 01 | 2001 | Install direct acting units in place of compressed air pressure system in safety system | $7,010 | $2,500 | |
| LE0127 #10 Y:2001 | 10 | 2001 | Reuse / recycle/ sell paper products | $1,572 | - | |
| LE0127 #09 Y:2001 | 09 | 2001 | Use closed cycle process to minimize waste water production | $11,681 | $3,750 |