Assessment Year | 2002 |
---|---|
Principal Product | centrifugal castings |
NAICS |
n/a
|
SIC | 3369: Nonferrous Foundries, Except Aluminum and Copper |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
40,000
ft2
|
Annual Production | 3,500,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $425,107 | 35,082,369 |
kWh
|
$0.012 |
Electricity Demand | $188,080 | 38,481 |
kW-mo/yr
|
$4.89 |
Electricity Fees | $10,339 | - |
|
- |
Natural Gas | $53,378 | 7,002 |
MMBtu
|
$7.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $590,871 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $373,919 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $7,010 | $2,500 |
$5,757
59,352
kWh
|
$1,253
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,154 | $3,000 |
$6,396
65,942
kWh
|
$1,758
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $11,155 | - |
$8,943
72,468
kWh
|
$2,212
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.1116: Improve combustion control capability | $3,312 | $1,600 | - | - |
$3,312
-
MMBtu
|
- | - | - | |
05 | 4.521: Clear and rent existing space | $110,000 | $4,500 | - | - | - | - | $110,000 | - | |
06 | 4.131: Modify process to reduce material use/cost | $237,600 | - | - | - | - | - | - | $237,600 | |
07 | 4.652: Replace existing equipment with more suitable substitutes | $166,320 | $100,000 | - | - | - | - | $166,320 | - | |
08 | 4.652: Replace existing equipment with more suitable substitutes | $47,320 | - | - | - | - | $47,320 | - | - | |
TOTAL RECOMMENDED | $590,871 | $111,600 |
$21,096
197,762
kWh
|
$5,223
-
kW-mo/yr
|
$3,312
-
MMBtu
|
$47,320 | $276,320 | $237,600 | ||
TOTAL IMPLEMENTED | $373,919 | $10,000 |
$21,096
197,762
kWh
|
$5,223
-
kW-mo/yr
|
- | - | $110,000 | $237,600 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs