Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product centrifugal castings
NAICS
n/a
SIC 3369: Nonferrous Foundries, Except Aluminum and Copper
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 40,000
ft2
Annual Production 3,500,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $425,107 35,082,369
kWh
Electricity Demand $188,080 38,481
kW-mo/yr
Electricity Fees $10,339 -
Natural Gas $53,378 7,002
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $590,871 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $373,919

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 2.4223: Install direct acting units in place of compressed air pressure system in safety system $7,010 $2,500 $5,757
59,352
kWh
$1,253
-
kW-mo/yr
- - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,154 $3,000 $6,396
65,942
kWh
$1,758
-
kW-mo/yr
- - - -
03 2.7111: Reduce illumination to minimum necessary levels $11,155 - $8,943
72,468
kWh
$2,212
-
kW-mo/yr
- - - -
04 2.1116: Improve combustion control capability $3,312 $1,600 - - $3,312
-
MMBtu
- - -
05 4.521: Clear and rent existing space $110,000 $4,500 - - - - $110,000 -
06 4.131: Modify process to reduce material use/cost $237,600 - - - - - - $237,600
07 4.652: Replace existing equipment with more suitable substitutes $166,320 $100,000 - - - - $166,320 -
08 4.652: Replace existing equipment with more suitable substitutes $47,320 - - - - $47,320 - -
TOTAL RECOMMENDED $590,871 $111,600 $21,096
197,762
kWh
$5,223
-
kW-mo/yr
$3,312
-
MMBtu
$47,320 $276,320 $237,600
TOTAL IMPLEMENTED $373,919 $10,000 $21,096
197,762
kWh
$5,223
-
kW-mo/yr
- - $110,000 $237,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs