| Assessment Year | 2009 |
|---|---|
| Principal Product | Asphalt paving mixtures |
| NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
| SIC | 2951: Asphalt Paving Mixtures and Blocks |
| Sales Range | $10 M to 50M |
| # of Employees | 6 |
| Plant Area |
52,500
ft2
|
| Annual Production | 450,000
ton
|
| Production Hrs. Annual | 2,389
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $237,409 | 1,899,263 |
kWh
|
$0.13 |
| Natural Gas | $321,202 | 45,690 |
MMBtu
|
$7.03 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $68,610 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $47,380 | $46,700 |
$47,380
379,000
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,410 | $2,000 |
$9,410
75,300
kWh
|
- | |
| 03 | 2.2515: Use optimum thickness insulation | $8,920 | $12,000 | - |
$8,920
-
MMBtu
|
|
| 04 | 2.4133: Use most efficient type of electric motors | $1,070 | $9,010 |
$1,070
8,600
kWh
|
- | |
| 05 | 2.9114: Use solar heat to make electricty | $1,830 | $10,599 |
$1,830
14,600
kWh
|
- | |
| TOTAL RECOMMENDED | $68,610 | $80,309 |
$59,690
477,500
kWh
|
$8,920
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs