ITAC Assessment: LM0028
ITAC logo
ITAC Assessment: LM0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product aluminum / zinc die castings
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 64,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $315,914 4,702,453
kWh
Electricity Demand $101,506 11,388
kW-mo/yr
Electricity Fees $20,496 -
Natural Gas $608,677 51,938
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $473,236 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $217,668

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Increase in Production Savings
01 2.2511: Insulate bare equipment $10,685 $980 - - $10,685
-
MMBtu
- -
02 2.2511: Insulate bare equipment $4,363 $2,200 - - $4,363
-
MMBtu
- -
03 2.2414: Use waste heat from hot flue gases to preheat $49,880 $53,000 - - $49,880
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,807 $800 $4,837
48,320
kWh
$690
-
kW-mo/yr
- $(-720.0) -
05 2.7145: Install skylights $5,597 $10,400 $4,978
41,612
kWh
$619
-
kW-mo/yr
- - -
06 2.4133: Use most efficient type of electric motors $9,289 $14,371 $8,125
81,098
kWh
$1,164
-
kW-mo/yr
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $147,649 $242,050 $129,159
1,289,263
kWh
$18,490
-
kW-mo/yr
- - -
08 4.426: Modify workload $202,176 $2,200 - - - $202,176 -
09 4.444: Install system to collect scrap $23,190 $13,500 - - - $23,190 -
10 4.625: Develop standard operating procedures $15,600 $1,780 - - - - $15,600
TOTAL RECOMMENDED $473,236 $341,281 $147,099
1,460,293
kWh
$20,963
-
kW-mo/yr
$64,928
-
MMBtu
$224,646 $15,600
TOTAL IMPLEMENTED $217,668 $3,980 $4,837
48,320
kWh
$690
-
kW-mo/yr
$10,685
-
MMBtu
$201,456 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs