111
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IA0291 #09 Y:2002 | 09 | 2002 | Replace electrically-operated equipment with fossil fuel equipment | $23,689 | $59,400 | |
| IA0291 #08 Y:2002 | 08 | 2002 | Use insulation in furnaces to facilitate heating / cooling | $7,328 | $25,016 | |
| IA0291 #07 Y:2002 | 07 | 2002 | Reschedule plant operations or reduce load to avoid peaks | $6,689 | $7,199 | |
| IA0291 #06 Y:2002 | 06 | 2002 | Use most efficient type of electric motors | $4,844 | $476 | |
| IA0291 #05 Y:2002 | 05 | 2002 | Utilize higher efficiency lamps and/or ballasts | $13,242 | $25,134 | |
| IA0291 #04 Y:2002 | 04 | 2002 | Utilize higher efficiency lamps and/or ballasts | $2,174 | $682 | |
| IA0291 #03 Y:2002 | 03 | 2002 | Reduce the pressure of compressed air to the minimum required | $2,120 | $50 | |
| IA0291 #02 Y:2002 | 02 | 2002 | Install compressor air intakes in coolest locations | $4,929 | $920 | |
| IA0291 #01 Y:2002 | 01 | 2002 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,222 | $685 | |
| DS0150 #07 Y:1999 | 07 | 1999 | Pay bills on time to avoid late fees | $277 | - | |
| DS0150 #06 Y:1999 | 06 | 1999 | Meter recycled water (to reduce sewer charges) | $626 | $400 | |
| DS0150 #05 Y:1999 | 05 | 1999 | Change procedures / equipment / operating conditions | $29,468 | $37,220 | |
| DS0150 #04 Y:1999 | 04 | 1999 | Reduce ventilation air | $32,699 | $30,301 | |
| DS0150 #03 Y:1999 | 03 | 1999 | Replace electrically-operated equipment with fossil fuel equipment | $14,552 | $15,640 | |
| DS0150 #02 Y:1999 | 02 | 1999 | Install occupancy sensors | $512 | $483 | |
| DS0150 #01 Y:1999 | 01 | 1999 | Use optimum thickness insulation | $6,312 | $2,897 | |
| DS0141 #10 Y:1999 | 10 | 1999 | Increase use of automation | $416,318 | $440,000 | |
| DS0141 #09 Y:1999 | 09 | 1999 | Consider use / purchase of bulk materials where possible | $3,240 | $1,000 | |
| DS0141 #08 Y:1999 | 08 | 1999 | Contract a wood pallet recycling company | $6,612 | $400 | |
| DS0141 #07 Y:1999 | 07 | 1999 | Change procedures / equipment / operating conditions | $77,215 | - |