Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Nonferrous foundries (castings)
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IA0291 #09 Y:2002 Replace electrically-operated equipment with fossil fuel equipment $23,689 $59,400
IA0291 #08 Y:2002 Use insulation in furnaces to facilitate heating / cooling $7,328 $25,016
IA0291 #07 Y:2002 Reschedule plant operations or reduce load to avoid peaks $6,689 $7,199
IA0291 #06 Y:2002 Use most efficient type of electric motors $4,844 $476
IA0291 #05 Y:2002 Utilize higher efficiency lamps and/or ballasts $13,242 $25,134
IA0291 #04 Y:2002 Utilize higher efficiency lamps and/or ballasts $2,174 $682
IA0291 #03 Y:2002 Reduce the pressure of compressed air to the minimum required $2,120 $50
IA0291 #02 Y:2002 Install compressor air intakes in coolest locations $4,929 $920
IA0291 #01 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $7,222 $685
DS0150 #07 Y:1999 Pay bills on time to avoid late fees $277 -
DS0150 #06 Y:1999 Meter recycled water (to reduce sewer charges) $626 $400
DS0150 #05 Y:1999 Change procedures / equipment / operating conditions $29,468 $37,220
DS0150 #04 Y:1999 Reduce ventilation air $32,699 $30,301
DS0150 #03 Y:1999 Replace electrically-operated equipment with fossil fuel equipment $14,552 $15,640
DS0150 #02 Y:1999 Install occupancy sensors $512 $483
DS0150 #01 Y:1999 Use optimum thickness insulation $6,312 $2,897
DS0141 #10 Y:1999 Increase use of automation $416,318 $440,000
DS0141 #09 Y:1999 Consider use / purchase of bulk materials where possible $3,240 $1,000
DS0141 #08 Y:1999 Contract a wood pallet recycling company $6,612 $400
DS0141 #07 Y:1999 Change procedures / equipment / operating conditions $77,215 -