Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Nonferrous foundries (castings)
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TN0490 #05 Y:1993 Utilize higher efficiency lamps and/or ballasts $408 $277
TN0490 #04 Y:1993 Install timers and/or thermostats $746 $460
TN0490 #03 Y:1993 Install compressor air intakes in coolest locations $1,097 $490
TN0490 #02 Y:1993 Isolate hot or cold equipment $2,687 $7,200
TN0490 #01 Y:1993 Insulate bare equipment $8,220 $1,081
TN0457 #05 Y:1992 Utilize higher efficiency lamps and/or ballasts $444 -
TN0457 #04 Y:1992 Conserve energy by efficient use of vending machines $518 $1,015
TN0457 #03 Y:1992 Eliminate leaks in inert gas and compressed air lines/ valves $3,886 $210
TN0457 #02 Y:1992 Utilize energy-efficient belts and other improved mechanisms $15,393 -
TN0457 #01 Y:1992 Install / repair insulation on steam lines $11,989 $368
TN0207 #05 Y:1984 Insulate bare equipment $250 $78
TN0207 #04 Y:1984 Install set-back timers $645 -
TN0207 #03 Y:1984 Use waste heat from hot flue gases to preheat $8,215 $21,000
TN0207 #02 Y:1984 Insulate bare equipment $18,357 $750
TN0207 #01 Y:1984 Analyze flue gas for proper air/fuel ratio $25,155 $12,500