ITAC Assessment: SF0644
ITAC logo
ITAC Assessment: SF0644
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Die Cast Parts
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 60,000
ft2
Annual Production 250,000
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,641 1,490,003
kWh
Electricity Demand $337,284 6,915
kW-mo/yr
Natural Gas $33,197 1,234
MMBtu
Waste Disposal Costs
Water Usage $26,794 965
Tgal
TOTAL YEARLY COSTS $685,916
RECOMMENDED SAVINGS* $406,173 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,514 - $10,714
55,314
kWh
- - - $2,800 -
02 2.6218: Turn off equipment when not in use $818 - $818
4,223
kWh
- - - - -
03 2.3191: Use demand controller or load shedder $69,072 - - $69,072
-
kW-mo/yr
- - - -
04 2.6218: Turn off equipment when not in use $1,029 - $1,029
5,314
kWh
- - - - -
05 2.7224: Reduce space conditioning during non-working hours $11,683 $2,000 $3,560
18,378
kWh
- - $8,123
-
MMBtu
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,268 $350 $747
3,857
kWh
$521
-
kW-mo/yr
- - - -
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $11,403 $3,643 $11,403
58,871
kWh
- - - - -
08 2.2531: Re-size charging openings or add movable cover or door $8,178 $5,000 $8,178
42,219
kWh
- - - - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,207 $8,069 $3,979
20,543
kWh
$5,228
-
kW-mo/yr
- - - -
10 2.8114: Change rate schedules or other changes in utility service $87,216 $146,113 - - $87,216 - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $13,685 $23,706 $7,439
38,402
kWh
$5,785
-
kW-mo/yr
- - $427 $34
12 2.3141: Use battery storage for demand control $39,673 $145,800 - $42,293
-
kW-mo/yr
$(-2,620.0) - - -
13 2.9114: Use solar heat to make electricty $139,427 $781,676 $139,427
719,810
kWh
- - - - -
TOTAL RECOMMENDED $406,173 $1,116,357 $187,294
966,931
kWh
$122,899
-
kW-mo/yr
$84,596 $8,123
-
MMBtu
$3,227 $34
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs