ITAC Assessment: DS0064
ITAC logo
ITAC Assessment: DS0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Brushless / AC-DC Motors
NAICS
n/a
SIC 3278:
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 21,465
ft2
Annual Production 430,600
pieces
Production Hrs. Annual 3,047
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,894 1,222,743
kWh
Electricity Demand $28,507 3,767
kW-mo/yr
Electricity Fees $2,659 -
Natural Gas $1,988 362
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,867 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,754

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,343 $2,500 $5,795
186,987
kWh
$331
-
kW-mo/yr
$(-3,783.0)
-
MMBtu
-
02 2.7261: Install timers and/or thermostats $1,273 $600 $707
22,860
kWh
- $566
-
MMBtu
-
03 2.2511: Insulate bare equipment $1,299 $1,675 $1,299
41,911
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $471 $225 $398
12,896
kWh
$73
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,059 $220 $886
28,722
kWh
$173
-
kW-mo/yr
- -
06 3.8211: Convert to aqueous cleaning system $5,422 - $1,723
55,686
kWh
$1,354
-
kW-mo/yr
- $2,345
-
gal
TOTAL RECOMMENDED $11,867 $5,220 $10,808
349,062
kWh
$1,931
-
kW-mo/yr
$(-3,217.0)
-
MMBtu
$2,345
-
gal
TOTAL IMPLEMENTED $7,754 $820 $3,316
107,268
kWh
$1,527
-
kW-mo/yr
$566
-
MMBtu
$2,345
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs