ITAC Assessment: DL0134
ITAC logo
ITAC Assessment: DL0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Silicone rubber composites and adhesives
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2822: Synthetic Rubber (Vulcanizable Elastomers)
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 129,220
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $673,019 7,488,041
kWh
Natural Gas $418,876 49,933
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $193,750 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $102,620

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Consumption Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $36,000 $33,600 $36,000
400,000
kWh
- -
02 2.2622: Replace existing chiller with high efficiency model $41,430 $54,000 $41,430
460,300
kWh
- -
03 2.7241: Install outside air damper / economizer on hvac unit $16,580 - $16,580
184,200
kWh
- -
04 2.2711: Utilize outside air instead of conditioned air for drying $4,630 $5,700 $1,910
21,250
kWh
$2,720
-
MMBtu
-
05 3.4114: Replace city water with recycled water via cooling tower $54,210 $28,110 - - $54,210
-
Tgal
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,090 $10,500 $9,090
101,000
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $23,200 $13,590 $23,200
257,400
kWh
- -
08 3.4155: Meter waste water $8,610 $8,200 - - $8,610
-
Tgal
TOTAL RECOMMENDED $193,750 $153,700 $128,210
1,424,150
kWh
$2,720
-
MMBtu
$62,820
-
Tgal
TOTAL IMPLEMENTED $102,620 $95,800 $94,010
1,044,500
kWh
- $8,610
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs