ITAC Assessment: BD0025
ITAC logo
ITAC Assessment: BD0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Reactors,Heat Exchangers & Recuperators
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 48
Plant Area 24,178
ft2
Annual Production 30
ton
Production Hrs. Annual 5,720
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,993 683,470
kWh
Natural Gas $11,326 2,719
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,692 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,371

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $2,949 $12,980 $2,949
38,687
kWh
-
02 2.2531: Re-size charging openings or add movable cover or door $4,321 $8,450 - $4,321
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $1,253 $400 $1,253
16,413
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,558 $60 $1,558
20,516
kWh
-
05 2.2437: Recover waste heat from equipment $4,840 $2,500 - $4,840
-
MMBtu
06 2.7135: Install occupancy sensors $2,685 $1,050 $2,685
35,170
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,086 $712 $3,086
40,739
kWh
-
TOTAL RECOMMENDED $20,692 $26,152 $11,531
151,525
kWh
$9,161
-
MMBtu
TOTAL IMPLEMENTED $16,371 $17,702 $11,531
151,525
kWh
$4,840
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs