Assessment Year | 1995 |
---|---|
Principal Product | Reactors,Heat Exchangers & Recuperators |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $5 M to 10M |
# of Employees | 48 |
Plant Area |
24,178
ft2
|
Annual Production | 30
ton
|
Production Hrs. Annual | 5,720
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $51,993 | 683,470 |
kWh
|
$0.076 |
Natural Gas | $11,326 | 2,719 |
MMBtu
|
$4.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,692 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,371 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,949 | $12,980 |
$2,949
38,687
kWh
|
- | |
02 | 2.2531: Re-size charging openings or add movable cover or door | $4,321 | $8,450 | - |
$4,321
-
MMBtu
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $1,253 | $400 |
$1,253
16,413
kWh
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,558 | $60 |
$1,558
20,516
kWh
|
- | |
05 | 2.2437: Recover waste heat from equipment | $4,840 | $2,500 | - |
$4,840
-
MMBtu
|
|
06 | 2.7135: Install occupancy sensors | $2,685 | $1,050 |
$2,685
35,170
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,086 | $712 |
$3,086
40,739
kWh
|
- | |
TOTAL RECOMMENDED | $20,692 | $26,152 |
$11,531
151,525
kWh
|
$9,161
-
MMBtu
|
||
TOTAL IMPLEMENTED | $16,371 | $17,702 |
$11,531
151,525
kWh
|
$4,840
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs