88
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Rolling, drawing, and extruding of nonferrous metals, except copper and aluminum | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
IC0259 #04 Y:2022 | 04 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $3,393 | $953 | |
IC0259 #03 Y:2022 | 03 | 2022 | Utilize higher efficiency lamps and/or ballasts | $10,107 | $15,295 | |
IC0259 #02 Y:2022 | 02 | 2022 | Eliminate or reduce compressed air usage | $9,350 | $730 | |
IC0259 #01 Y:2022 | 01 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $914 | $50 | |
LE0356 #12 Y:2013 | 12 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,638 | $1,086 | |
LE0356 #11 Y:2013 | 11 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $8,608 | $25,060 | |
LE0356 #10 Y:2013 | 10 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $3,399 | $3,700 | |
LE0356 #09 Y:2013 | 09 | 2013 | Recover waste heat from equipment | $3,341 | - | |
LE0356 #08 Y:2013 | 08 | 2013 | Install compressor air intakes in coolest locations | $2,139 | $1,500 | |
LE0356 #07 Y:2013 | 07 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,343 | $1,000 | |
LE0356 #06 Y:2013 | 06 | 2013 | Reduce the pressure of compressed air to the minimum required | $1,451 | $520 | |
LE0356 #05 Y:2013 | 05 | 2013 | Adjust burners for efficient operation | $756 | - | |
LE0356 #04 Y:2013 | 04 | 2013 | Close holes and openings in building such as broken windows | $146 | $338 | |
LE0356 #03 Y:2013 | 03 | 2013 | Insulate glazing, walls, ceilings, and roofs | $10,894 | $51,200 | |
LE0356 #02 Y:2013 | 02 | 2013 | Utilize higher efficiency lamps and/or ballasts | $2,126 | $3,215 | |
LE0356 #01 Y:2013 | 01 | 2013 | Utilize higher efficiency lamps and/or ballasts | $2,905 | $5,175 | |
AM0622 #10 Y:2012 | 10 | 2012 | Use synthetic lubricant | $550 | - | |
AM0622 #09 Y:2012 | 09 | 2012 | Utilize daylight whenever possible in lieu of artificial light | $560 | - | |
AM0622 #08 Y:2012 | 08 | 2012 | Reschedule plant operations or reduce load to avoid peaks | $2,300 | - | |
AM0622 #07 Y:2012 | 07 | 2012 | Utilize higher efficiency lamps and/or ballasts | $2,780 | $870 |