Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Rolling, drawing, and extruding of nonferrous metals, except copper and aluminum
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0259 #04 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $3,393 $953
IC0259 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $10,107 $15,295
IC0259 #02 Y:2022 Eliminate or reduce compressed air usage $9,350 $730
IC0259 #01 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $914 $50
LE0356 #12 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $12,638 $1,086
LE0356 #11 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $8,608 $25,060
LE0356 #10 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $3,399 $3,700
LE0356 #09 Y:2013 Recover waste heat from equipment $3,341 -
LE0356 #08 Y:2013 Install compressor air intakes in coolest locations $2,139 $1,500
LE0356 #07 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $1,343 $1,000
LE0356 #06 Y:2013 Reduce the pressure of compressed air to the minimum required $1,451 $520
LE0356 #05 Y:2013 Adjust burners for efficient operation $756 -
LE0356 #04 Y:2013 Close holes and openings in building such as broken windows $146 $338
LE0356 #03 Y:2013 Insulate glazing, walls, ceilings, and roofs $10,894 $51,200
LE0356 #02 Y:2013 Utilize higher efficiency lamps and/or ballasts $2,126 $3,215
LE0356 #01 Y:2013 Utilize higher efficiency lamps and/or ballasts $2,905 $5,175
AM0622 #10 Y:2012 Use synthetic lubricant $550 -
AM0622 #09 Y:2012 Utilize daylight whenever possible in lieu of artificial light $560 -
AM0622 #08 Y:2012 Reschedule plant operations or reduce load to avoid peaks $2,300 -
AM0622 #07 Y:2012 Utilize higher efficiency lamps and/or ballasts $2,780 $870