Assessment Year | 2012 |
---|---|
Principal Product | Tubing |
NAICS | 331491: Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, and Extruding |
SIC | 3356: Rolling, Drawing, and Extruding of Nonferrous Metals, Except Copper and Aluminum |
Sales Range | $50 M to 100M |
# of Employees | 145 |
Plant Area |
165,000
ft2
|
Annual Production | 3,600
thousand feet
|
Production Hrs. Annual | 8,592
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $751,791 | 10,609,317 |
kWh
|
$0.071 |
Electricity Demand | $0 | 23,364 |
kW-mo/yr
|
$0.000 |
Electricity Fees | $4,340 | - |
|
- |
Natural Gas | $227,242 | 42,954 |
MMBtu
|
$5.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $177,030 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $37,510 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.132: Purchase new equipment to reduce material use / cost | $80,000 | $240,000 | - | - | - | - | $80,000 | |
02 | 3.4151: Minimize water usage | $42,000 | $7,000 | - | - |
$(-2,760.0)
-
MMBtu
|
- | $44,760 | |
03 | 2.4133: Use most efficient type of electric motors | $25,450 | $69,300 |
$23,510
419,900
kWh
|
$1,940
-
kW-mo/yr
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,720 | $520 |
$8,060
144,000
kWh
|
$660
-
kW-mo/yr
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,770 | $55 |
$7,170
128,000
kWh
|
$600
-
kW-mo/yr
|
- | - | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,900 | $500 | - | - |
$6,900
-
MMBtu
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,780 | $870 |
$315
5,600
kWh
|
$25
-
kW-mo/yr
|
- | $2,440 | - | |
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,300 | - | - |
$2,300
-
kW-mo/yr
|
- | - | - | |
09 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $560 | - |
$490
8,700
kWh
|
$70
-
kW-mo/yr
|
- | - | - | |
10 | 2.4314: Use synthetic lubricant | $550 | - |
$510
9,000
kWh
|
$40
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $177,030 | $318,245 |
$40,055
715,200
kWh
|
$5,635
-
kW-mo/yr
|
$4,140
-
MMBtu
|
$2,440 | $124,760 | ||
TOTAL IMPLEMENTED | $37,510 | $70,690 |
$32,375
578,200
kWh
|
$2,695
-
kW-mo/yr
|
- | $2,440 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs