ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
NT0026 #05 Y:2024 | 05 | 2024 | Apply for investment incentives | $133,205 | - |
n/a
|
NT0026 #04 Y:2024 | 04 | 2024 | Optimize plant power factor | $122,072 | $90,330 |
n/a
|
NT0026 #03 Y:2024 | 03 | 2024 | Utilize higher efficiency lamps and/or ballasts | $109,656 | $54,987 |
n/a
|
NT0026 #02 Y:2024 | 02 | 2024 | Reduce the pressure of compressed air to the minimum required | $22,341 | - |
n/a
|
NT0026 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,160 | $5,609 |
n/a
|
GT0967 #07 Y:2023 | 07 | 2023 | Optimize plant power factor | $2,881 | $13,403 | |
GT0967 #06 Y:2023 | 06 | 2023 | Use solar heat to make electricty | $237,120 | $2,593,008 | |
GT0967 #05 Y:2023 | 05 | 2023 | Use optimum size and capacity equipment | $5,843 | $24,000 | |
GT0967 #04 Y:2023 | 04 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $968 | $576 | |
GT0967 #03 Y:2023 | 03 | 2023 | Reduce space conditioning during non-working hours | $4,800 | $1,000 | |
GT0967 #02 Y:2023 | 02 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $48,377 | $1,850 | |
GT0967 #01 Y:2023 | 01 | 2023 | Apply for tax-free status for energy purchases | $23,763 | $800 | |
UF0596 #11 Y:2023 | 11 | 2023 | Meter recycled water (to reduce sewer charges) | $3,156 | $2,352 | |
UF0596 #10 Y:2023 | 10 | 2023 | Improve space comfort conditioning | $26,447 | $4,768 | |
UF0596 #09 Y:2023 | 09 | 2023 | Utilize controls to operate equipment only when needed | $12,289 | $25,440 | |
UF0596 #08 Y:2023 | 08 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $27,499 | $1,399 | |
UF0596 #07 Y:2023 | 07 | 2023 | Use or replace with energy efficient substitutes | $47,000 | $171,903 | |
UF0596 #06 Y:2023 | 06 | 2023 | Install soft-start to eliminate nuisance trips | $50,904 | $49,563 | |
UF0596 #05 Y:2023 | 05 | 2023 | Use demand controller or load shedder | $145,162 | $141,225 | |
UF0596 #04 Y:2023 | 04 | 2023 | Reduce combustion air flow to optimum | $213,087 | - |